Skip to main content April 2015 Investor Meeting – Laredo Petroleum Inc. Investor Presentation | Shale Experts
Loading...

April 2015 Investor Meeting – Laredo Petroleum Inc.

Laredo Petroleum Inc. · Apr 13, 2015 · 146 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 1
    Investor Meeting 2015 April 13, 2015 Houston, TX 1
  2. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 2
    Agenda Introduction Ron Hagood Strategic Overview Randy Foutch Land Position Mark King Reserves & Resource Gary Smallwood Importance of Data Collection & Analysis to Value Creation Patrick Curth Drilling Inventory Value…
  3. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 3
    Strategic Overview Randy Foutch Chairman & Chief Executive Officer 4
  4. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 4
    Do It Right From the Start Focus on long-term value from the beginning Hire quality people, and support them with the tools they need to be successful Acquire contiguous acreage in the right basin Collect quality data at the right…
  5. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 5
    Targeted Acreage in the Best Basin Clearfork Permian Basin Attributes Upper Spraberry Tremendous oil in place Lower Long history of oil production Spraberry Multi-stack horizontal targets 4,500 gross ft of prospective zones…
  6. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 6
    Contiguous Acreage Position With Significant Potential 179,722 Gross/149,141 net acres1 4.3 billion barrels of resource potential on 7,700 identified locations 3,200 operated Development Ready Hz locations with 90% average WI…
  7. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 7
    Adding Value Through Data Collection & Analysis Earth Optimization Model Highgrading Cumulative Resource Potential Knowledge Development Discovery Development Lower Wolfcamp Additional Zones & New Middle Wolfcamp…
  8. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 8
    4,500 gross ft of prospective zones Developed to Maximize NPV cline spraberry upper wolfcamp middle wolfcamp lower wolfcamp canyon penn cline cline shale strawn fusselman Laredo is focused on developing the entire resource and…
  9. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 9
    Infrastructure Integrated with Complete Development Plan Oil Takeaway Pipeline Oil Gathering Station Plains to Midland Oil Gathering Line Gas Lift Compression Facility Oil Takeaway Pipeline Medallion to Colorado City…
  10. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 10
    Growing Production with Greater Efficiencies Delineation Development Testing Development Transition to Single-Well Pads Multi-Well Pads Multi-Well Pads 50 45 40 35 30 MBOE/D 25 20 15 10 5 0 1Q-11…
  11. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 11
    Recent Accomplishments Proved the value of multi-well pads Expanded infrastructure including production corridors and Medallion pipeline Expanded well inventory Advanced Earth Model to support well planning Improved operating…
  12. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 12
    Flexibility in Face of Commodity Price Decline Laredo took immediate and decisive action to structure the Company for a low-price environment 105 95 85 Aligning cash flows and capital expenditures LPI Hedge Floor: 81/Bbl 75…
  13. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 13
    Laredo has . . . Strong Board and management team with highly experienced employee base High-quality, contiguous acreage across its large leasehold Deep inventory of data-supported locations in stacked zones Growing and valuable…
  14. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 14
    Land Position Mark King Vice President - Land 15
  15. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 15
    Land Position Chronology EXPLORATION DELINEATION DEVELOPMENT 2008 2010 2012 2015 Howard Howard Howard Howard Glasscock Glasscock Glasscock Glasscock Sterling Sterling Sterling Sterling Reagan LPI leasehold Irion Irion…
  16. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 16
    Concentrated Position With High Working Interest 179,722 Gross/149,141 net acres1 4.3 billion barrels of resource potential on 7,700 identified locations 3,200 operated Development Ready Hz locations with 90% average WI 96%…
  17. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 17
    Decreasing Vertical Drilling Activities 12 10 Vertical Rig Count 8 6 4 2 0 4Q-12 4Q-16 1Q-12 2Q-12 3Q-12 1Q-13 2Q-13 3Q-13 4Q-13 1Q-14 2Q-14 3Q-14 4Q-14 1Q-15 2Q-15 3Q-15 4Q-15 1Q-16 2Q-16…
  18. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 18
    Contiguous Acreage Enables Efficient Development Regan North development program Example of a development ready corridor LPI leasehold containing at least 450 future locations with an 98% average working interest1 1 As of…
  19. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 19
    Land Summary Current Build contiguous acreage block for efficient drilling: In the best part of the Midland Basin With high working interest With numerous operated horizontal locations for long lateral drilling HBP the acreage in…
  20. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 20
    Reserves & Resource Gary Smallwood Vice President Reservoir Modeling & Field Development 21
  21. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 21
    2014 Reserve Summary Permian Year-End Reserves1 350 300 297 250 200 MMBOE 150 100 50 25% Oil 47% 0 NGL YE-11 YE-12 YE-13 YE-14 Natural Gas 28% Developed Undeveloped 1 Based on YE-2014 2-stream…
  22. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 22
    Upper Wolfcamp 7,500 Type Curve EUR: 850 MBOE (45% oil) 200,000 180 cumulative: 55 MBO (60% oil) 160,000 Cumulative Production 80 UWC wells 120,000 (BOE) 60 UWC wells operated by LPI included in 7,500 type curve…
  23. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 23
    Middle Wolfcamp 7,500 Type Curve EUR: 750 MBOE (50% oil) 200,000 180 cumulative: 49 MBO (61% oil) 160,000 Cumulative Production 28 MWC wells 120,000 26 MWC wells operated by LPI (BOE) included in 7,500 type curve…
  24. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 24
    Lower Wolfcamp 7,500 Type Curve EUR: 700 MBOE (45% oil) 200,000 180 cumulative: 44 MBO (55% oil) 160,000 Cumulative Production 20 LWC wells 120,000 20 LWC wells operated by LPI (BOE) included in 7,500 type curve…
  25. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 25
    Cline 7,500 Type Curve 200,000 EUR: 725 MBOE (50% oil) 180 cumulative: 52 MBO (55% oil) 160,000 Cumulative Production 50 Cline wells 120,000 12 Cline wells operated by LPI (BOE) included in 7,500 type curve 80,000…
  26. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 26
    Introduction to 10,000 Type Curves Initial 10,000 predictions based on a formulaic analysis of data relating to inventory of well results and lateral length LPI used the same process to transition from 4,000 to 7,500 laterals…
  27. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 27
    10,000 Lateral Type Curves Upper Wolfcamp Middle Wolfcamp 10,000 10,000 1,000 1,000 BOE/D BOE/D 100 100 10 10 Normalized Production1 Type Curve Normalized Production1 Type Curve 1 1 0 500 1,000 1,500 0 500 1,000…
  28. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 28
    ROR Sensitivities vs Strip Pricing1 7,500' Single-Well Pad ROR Sensitivities 7,500' Multi-Well Pad ROR Sensitivities 60% 60% 50% 50% 40% 40% ROR % ROR % 30% 30% 20% 20% 10% 10% 0% 0% -10% Strip +10% +20% -10% Strip +10%…
  29. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 29
    Development Ready Resource Potential 4,500 4,000 3,500 3,000 MMBOE 2,500 2,000 1,500 1,000 500 0 Total Proved 1 Development 2 Resource Resource Total Resource 12/31/14 Ready Confirmed Untested Potential 1…
  30. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 30
    Importance of Data Collection & Analysis to Value Creation Patrick Curth Senior Vice President Exploration & Land 31
  31. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 31
    Good Data Drives Innovation Better Data Better Information Better Results Enhanced Value Step One: Data Collection, systematically obtain high-quality technical information over the whole asset, early in the learning cycle, to…
  32. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 32
    Adding Value Through Data Collection & Analysis Earth Optimization Model Highgrading Cumulative Resource Potential Knowledge Development Discovery Development Lower Wolfcamp Additional Zones & New Middle Wolfcamp…
  33. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 33
    Vertical Wells Across Asset Enable Data Collection HOWARD MITCHELL Laredo Petroleum has taken advantage of its vertical well program to gather critical open-hole and petrophysical data GLASSCOCK 950 vertical wells across…
  34. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 34
    Permian Asset Extensive Technical Database Technical database consisting of whole cores, sidewall cores, single-zone tests, open-hole logs, 3D seismic and production logs Provides the building blocks for identification of resource…
  35. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 35
    Core Data Cores provides the technical bridge between the actual reservoir rocks and the petrophysical analysis metrics 3,700 of proprietary whole cores in objective section 14 whole cores 715 sidewall core samples In addition…
  36. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 36
    Geophysical Data High-quality 3D seismic is a key foundation of the Earth Model in that it gives the geoscientists insight as to how the area-wide reservoir, petrophysical and seismic properties correlate relative to each targeted…
  37. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 37
    3D Seismic Program A high-quality, meaningful data set High fold: 250 fold (historical data sets are 100 fold or less) High frequency sweeps: up to 120 hertz Tight bin spacing: 70 feet (normal is 110 feet or greater) Wide…
  38. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 38
    Log Data Logs provide the framework for building the Earth Model and tying in the available petrophysical database 8,000 conventional public and proprietary open-hole logs 303 in-house proprietary petrophysical logs Extensive…
  39. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 39
    Dipole Sonic Importance & Integration Laredo was one of the first operators in the Midland Basin to acquire dipole enhanced geophysics for completion design Laredo now has 120 dipole sonic logs Dipole sonic is now the operator…
  40. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 40
    Integrated Petrophysics at Laredo Reservoir Characterization Fluid Characterization Rock properties that define Oil, gas & water proportions the reservoir Moveable vs. bound fluid Earth Model integration Identification of high oil…
  41. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 41
    Multi-Stacked Targets With Significant Resource Potential Utilization of our large technical dataset has permitted the identification, evaluation and ability to estimate resource potential across primary and additional horizons Upper…
  42. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 42
    Production Logs & Single-Zone Tests Single-zone tests confirm the productivity of potential zones Provide a multi-phase analysis (oil, gas & water) of each stage completed Identify the source of hydrocarbon (oil & gas) and water…
  43. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 43
    Drilling Inventory Patrick Curth Senior Vice President Exploration & Land 44
  44. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 44
    Multi-Stacked Targets with Significant Resource Potential Average Thickness Primary Targets (gross ft.) Midland Basin is unique among Upper Wolfcamp 489 U.S. shale resource plays due to Middle Wolfcamp 520 Lower Wolfcamp 493 the…
  45. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 45
    Location(s), Location(s), Location(s) Concentrated multi-zone horizontal development Laredo Petroleum has categorized its horizontal drilling inventory utilizing the following classifications: De-Risked Development Ready Locations…
  46. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 46
    Wolfcamp Inventory Development Hz Commerciality Hz Commerciality Formation/Zone Ready Confirmed Not Confirmed Upper Wolfcamp 828 36 637 Middle Wolfcamp 807 36 721 Lower Wolfcamp 813 36 722 Total 2,448 108 2,080 Formation/Zone LPI…
  47. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 47
    Canyon Inventory Development Hz Commerciality Hz Commerciality Formation/Zone Ready Confirmed Not Confirmed Canyon 311 593 686 Formation/Zone LPI Operated Hz wells Canyon 2 LPI Hz Canyon well Canyon Development Ready…
  48. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 48
    Cline Inventory Development Hz Commerciality Hz Commerciality Formation/Zone Ready Confirmed Not Confirmed Cline 1,223 182 161 Formation/Zone LPI Operated Hz Wells Cline 52 LPI Hz Cline well Cline Development Ready Hz…
  49. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 49
    Identified Resource Potential 4,500 4,000 3,500 3,000 MMBOE 2,500 2,000 1,500 1,000 500 0 Total Proved1 Development 2 Hz Hz Total Resource (12/31/14) Ready Commerciality Commerciality Potential Confirmed Not…
  50. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 50
    Value Creation Through Development & Discovery Mark Elliott Vice President Geology & Development- Permian 51
  51. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 51
    Adding Value Through Development & New Discovery Earth Optimization Model Highgrading Cumulative Resource Potential Knowledge Development Discovery Development Lower Wolfcamp Additional Zones & New Middle Wolfcamp…
  52. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 52
    Regional Cross-Section 1 1 2 3 4 5 6 7 8 9 10 2 North South 3 Upper 4 Spraberry 5 6 7 Lower Spraberry 8 UWC 9 MWC 10 10 MILES LWC Flattened on the Middle Wolfcamp Canyon 500 Cline Strawn - GAMMA RAY ABW -…
  53. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 53
    Canyon Formation: Data Driven Discovery Clearfork Development Upper Spraberry Lower Spraberry Geologic Dean Delineation Concept Upper Wolfcamp Middle Wolfcamp Lower Wolfcamp Canyon Penn Shale Data Collection, Cline…
  54. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 54
    Canyon Formation: Geologic Concept Conger Gas Field: Cumulative Oil: 30.8 MMBbl Cumulative Gas: 839.5 BCF Sugg Ranch Gas Field: Cumulative Oil: 43.9 MMBbl Cumulative Gas: 624.3 BCF Structural Dip Laredo acreage positioned…
  55. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 55
    Canyon Formation: Data Collection, Analysis & Integration Canyon Specific Database Production logs (17) Provide a quantitative production profile from multiple zones One of several qualitative tools to confirm hydrocarbon potential…
  56. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 56
    Canyon Formation: Geologic Concept Lower Distal/Medial Proximal Slope Basin Plain Basin Plain Fine Grained Clastic Sandstone Turbidites Finely laminated Debrites Shale West East Laredo Acreage Depositional system…
  57. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 57
    Canyon Formation: Production Logs 30 BO/D & 102 Mcf/D & 82 BW/D MARTIN HOWARD MITCHELL 32 BO/D & 14 Mcf/D & 108 BW/D Production logs 47 BO/D & 52 Mcf/D & 232 BW/D from vertical wells MIDLAND GLASSCOCK 46 BO/D & 221 Mcf/D &…
  58. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 58
    Canyon Formation: Discovery & Delineation LPI - Glass 22A-Aermotor 7SP 7,000 Lateral 30 Day IP: 1,151 BOED EUR 650 MBOE Normalized 7,500 lateral EUR: 696 MBOE LPI - Barbee C-1-1B 2SP 8,300 Lateral WOC EOG Rocker B 1949 1H…
  59. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 59
    Canyon Formation: Summary Data driven discovery Initial well results very encouraging 30-day IP: 1,151 BOE/D 90-day cumulative: 72,990 BOE Confirmation well drilled and waiting on completion Good mud log shows throughout the…
  60. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 60
    Wolfcamp & Cline Formations: Concept to Development Clearfork Development Upper Spraberry Lower Spraberry Geologic Dean Delineation Concept Upper Wolfcamp Middle Wolfcamp Lower Wolfcamp Canyon Penn Shale Data…
  61. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 61
    Wolfcamp and Cline Formation: Geologic Concept Medial Distal Basin Basin Plain Lower Plain Slope/Toe of Proximal Slope Basin Plain Thick light to Argillaceous Siltstone, Silica Rich, Brittle, Silty-Shale medium gray…
  62. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 62
    Wolfcamp & Cline: Data Collection, Analysis & Integration Wolfcamp & Cline Specific Database Production logs (36) Provide a quantitative production profile from multiple zones One of several qualitative tools to confirm hydrocarbon…
  63. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 63
    Wolfcamp & Cline: Discovery, Delineation & Discovery Data driven approach Proven geologic concept Data collection, analysis & integration ongoing Discovery & Deliniation wells drilled and completed in Upper, Middle and Lower…
  64. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 64
    Earth Model James Courtier Vice President Exploration & Geosciences Technology 65
  65. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 65
    Adding Value Through Optimization: Earth Model Earth Optimization Model Highgrading Cumulative Resource Potential Knowledge Development Discovery Development Lower Wolfcamp Additional Zones & New Middle Wolfcamp…
  66. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 66
    Earth Model Objectives Standard Wellbore 1 Select Landing Point 2 3 4 6 2 Geosteering (stay in zone) 3 Frac Design 5 & Spacing 4 Frac 1 Barrier 5 Lateral Length 6 Earth Model potential to optimize development &…
  67. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 67
    Earth Model Workflow & Learning Process Highgrade EUR & NPV targets Plan new wells & Acquire & execute operations assemble data EARTH MODEL DEVELOPMENT Perform lookback CYCLE Multivariate analysis & confirm statistical…
  68. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 68
    Step 1: Acquire & Assemble Data Completion Production Geological Pre-stack Core Data Petrophysics Microseismic Well data logs & model inversion production single-zone data tests High-quality database required for success…
  69. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 69
    Step 2: Define Multivariate Relationships & Relate to IP 36 Wells 0.81 Correlation Coefficient Earth Model Predicted 90-day Cumulative Oil 200% Fluid / Stress Fracturing 175% 150% (% of Type Curve) 125% Brittleness…
  70. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 70
    Step 3: Create 3D Production Attribute Fluid / Stress Fracturing Brittleness Lithology Storage 0 30K 60K 90-day Cumulative Oil (BO) Landing, geosteering & staying in-zone fundamentally linked to highest 90-day…
  71. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 71
    Step 4: Confirm Statistical Relationship 53 Wells 0.79 Correlation Coefficient 200% Calibration Wells Northern Reagan validation wells with 90-days production history Predicted 90-day Cumulative Oil 175% Validation Wells…
  72. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 72
    Contrasting Upper Wolfcamp Lookback Examples Above Type Curve Below Type Curve Projected 90-day Cumulative Oil: 47,000 BO Projected 90-day Cumulative Oil: 24,636 BO 7,741 Lateral Length Actual 7,257 Lateral Length Upper…
  73. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 73
    Step 5: New Well Planning & Execute Operations Flowback & Well Planning Drilling Completion Production Pick landing point Land & geosteer well Review Earth Model on Closely monitor Define Hz trajectory using Earth Model…
  74. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 74
    Earth Model Well Integration Calibration & Calibrate Validation Wells Validate Northern Reagan 23 Implement 36 4 24 17 13 5 3 5 5 Central Reagan Lookback Calibration Lookback Lookback Wells Drilling Wells Flowing Waiting…
  75. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 75
    Middle Wolfcamp Targeting Uplift Example Middle Wolfcamp Lookback & Type Curve Middle Wolfcamp Targeting Example 90-day Cumulative Oil Production 40,000 Optimized As Drilled Original Plan Cumulative Oil Production (BO) 30,000…
  76. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 76
    Potential Upper Wolfcamp Economic Uplift Implications 7,500 Upper Wolfcamp Multi-Well Pad Type Curve 50% Earth Model demonstrates increases in 90-day cumulative oil production 40% Upper Wolfcamp Type Curve ROR: 26% Earth Model…
  77. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 77
    Earth Model Future Development 1 Southern Howard Central & Southern Glasscock Earth Q3/Q4 2015 Start Model in progress Northeastern Tie producing Southern Wolfcamp & Glasscock Q3 2015 Start Canyon zones into Northern acreage…
  78. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 78
    Development Overview Jay Still President & Chief Operating Officer 79
  79. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 79
    Refining the Manufacturing Process Laredo believes better data leads to better decisions Since inception we have been testing concepts and analyzing data that has enabled us to move fully into the manufacturing process Confirmed…
  80. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 80
    Refining the Manufacturing Process: Multi-Well Pads Stacked Lateral Multi-Well Pads Horizontal Wells on Multi-Well Pads Four-stacked Three-stacked Two-stacked 2013 13 of pads 2 11 16 completed 2014 56 73 wells total1 2015 4 to…
  81. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 81
    Refining the Manufacturing Process: Adjacent Well Spacing Confirmed 660' Adjacent Well Spacing Middle Wolfcamp 190 2HM(SXS): 994 MBOE Type Curve: 750 MBOE T190 1HM(SXS): 709 MBOE Upper Wolfcamp Type Curve: 850 MBOE…
  82. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 82
    Refining the Manufacturing Process: Vertical Separation Vertical spacing of horizontal wells needs to be 400' EUR % of Type Curve vs. Well Spacing 5% 375' 200 (u) Upper Wolfcamp % of Type Curve vs Well Spacing 0%…
  83. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 83
    Refining the Manufacturing Process: Frac Impacts Frac Impact Example Frac impacts affect production but not reserves Frac impacts must be anticipated and planned around 40 days at 0 oil production Frac Impacts 84
  84. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 84
    Refining the Manufacturing Process: Stimulation Design Ceramic and resin coated sand proppant 20,000 Cline Test 35,000 Cline Test Slight Improvement Slight Improvement 18,000 Ceramic Ceramic 30,000 Resin Coated Sand 16,000…
  85. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 85
    Refining the Manufacturing Process: Stimulation Design More sand / more clusters Middle Wolfcamp Lower Wolfcamp 12,000 12,000 No Clear Improvement 40% Improvement 10,000 10,000 50 cluster spacing vs. 90 67% more sand 50 cluster…
  86. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 86
    Refining the Manufacturing Process: Stimulation Design Engineered perforations and clusters Upper Wolfcamp Lower Wolfcamp 18,000 12,000 Clear Improvement 16,000 No Improvement 10,000 14,000 Cumulative BOE / 1,000 ft 12,000…
  87. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 87
    Refining the Manufacturing Process: Development Simultaneous drilling, completion and production activity Successfully tested heel-to-heel drilling while completing wells going north and south Have successfully walked rigs from…
  88. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 88
    Best Composite Well: Cline Example Cline Best Composite Well 0 1,000 2013 Composite well goals 2,000 Continuous improvement 3,000 2014 Identification of best practices 4,000 2015 Implementation of best practices 5,000 6,000…
  89. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 89
    Composite Average Wells Comparison (Cline Example) Days vs. Depth 0 2013 2014 2015 5,000 = Average = Best Composite Depth (feet) 30% Reduction 10,000 25% Reduction 15,000 +900 MD 32 days 45.5 days 24 days 32…
  90. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 90
    Multi-Well Pad Savings 500,000 450,000 400,000 Completion 350,000 Savings per well 300,000 250,000 200,000 150,000 Drilling 100,000 50,000 - 2 Well Pad 4 Well Pad Rig moves Location Drill pipe handling Frac…
  91. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 91
    Drilling & Completion AFE Components Drilling Completion Production Facilities 45% 51% 4% 92
  92. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 92
    Drilling & Completion: Service Cost Reductions D&C AFE Components Rentals Cement 5% 3% Drilling Rig Completion 10% Services 34% 15% - 20% cost reductions to date D&C Fluids from service costs 13% D&C Tangibles Other +…
  93. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 93
    Well Cost Evolution (7,500 Laterals) 2013 2015 Cline Lower Wolfcamp Middle Wolfcamp Upper Wolfcamp 94
  94. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 94
    JE Cox Blanco Corridor Development JE Cox Blanco Corridor Atlas Gas interconnect F F Centralized Gas Compression and F Conditioning Unit Crude Oil Station Reagan North Corridor JE Cox Blanco Corridor Oil takeaway…
  95. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 95
    JE Cox Blanco Corridor Development (UWC/LWC Well Pairs) Fleet 1 Fleet 2 zipper frac zipper frac Lanes 7 & 8 wells currently flowing UWC/LWC UWC/LWC lane 1 lane 4 Step 1 Lanes 1 2 3 4 5 6 7 8 1-1/2 sections / 16 wells /…
  96. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 96
    JE Cox Blanco Corridor Development (UWC/LWC Well Pairs) Fleet 1 zipper Fleet 2 zipper frac UWC/LWC frac UWC/LWC lane 2 lane 3 Step 2 Run microseismic in lanes 1 & 4 to watch fracs in lane 2 & lane 3 Lanes 1 2 3 4 5 6 7 8…
  97. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 97
    JE Cox Blanco Corridor Development (UWC/LWC Well Pairs) Bring lanes Fleet 1 & 2 1 3 on zipper frac production UWC/LWC lanes 5 & 6 Step 3 Lane 4 left shut-in to Lane 7 left shut-in to protect wells in lanes 1 - 3 protect well…
  98. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 98
    Reagan North Corridor Rig 1 Rig 2 Rig 3 Rig 4 Rig 5 Rig 6 3 miles LPI leasehold Laredo Acreage Regan North corridor area Drilled To be drilled 7 miles Two rigs on the west side of the corridor march to the east…
  99. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 99
    Reagan North Area: Development Plan Step 1: UWC/MWC pairs in North direction Step 2: UWC/MWC pairs in South direction Plane UWC view MWC UWC Rig 2 Rig 2 MWC UWC MWC UWC Rig 1 Rig 1 MWC Cross-section view UWC MWC Eight…
  100. April 2015 Investor Meeting – Laredo Petroleum Inc. – slide 100
    Reagan North Area: Development Plan Future Drilling: LWC/Cny/C pairs in North direction Futue Drilling: LWC/Cny/C pairs in South direction Plane view LWC Cny/C LWC Rig 2 Rig 2 Cny/C LWC Cny/C LWC Rig 1 Rig 1 Cny/C…

Showing the first 100 of 146 slides. Open the presentation viewer for the full deck.

From the store

Browse maps, data & reports in the Shale Experts store