Callon initiated a horizontal drilling program at its East Bloxom field in the second quarter of 2012, targeting the Wolfcamp B shale. The first well, the Neal #321H (100% WI), was drilled to a lateral length of 7,430 feet, and was completed with 27 fracture stimulation stages.