Rosehill Resources Inc. reported its Q1 2019 results. Here are the highlights from its report and presentation.
Improved efficiencies in Southern Delaware from reducing drilling times to 14.7 days per well in the first quarter, down 31% from full-year 2018.
Rosehill also reduced most recent one-mile Southern Delaware well cost to approximately $6.9 million per well - this is down 14% compared to $8.0 million per well for initial wells drilled in 2018.
Southern Delaware - In the Southern Delaware, the Company recently placed six wells onto production. As previously indicated, the Company installed ESPs on each of these wells shortly after initial flowback in order to enhance economics and optimize each well's production profile.
The IP24 results from ESP installation for these six wells averaged 1,152 BOEPD, or 252 BOEPD per 1,000 feet, and are presented in the table below.
IP24 | IP24 | ||||||
Well | Formation | BOEPD | BOEPD per 1,000' LL | Oil % | |||
State Blanco 58 G003 | Wolfcamp A | 938 | 230 | 88 | % | ||
State Blanco 58 H001 | Wolfcamp B | 1,055 | 230 | 88 | % | ||
State Blanco 58 G001 | Wolfcamp B | 1,088 | 247 | 91 | % | ||
Trees Estate 77 A001 | Wolfcamp B | 1,115 | 238 | 92 | % | ||
Trees Estate 77 H001 | Wolfcamp A | 1,428 | 300 | 89 | % | ||
Trees Estate 77 H003 | Wolfcamp B | 1,290 | 269 | 93 | % |
Northern Delaware - In the Northern Delaware, the Company placed on production the Z&T 20 E006 in late April targeting the 2nd Bone Spring Sand formation. The well reached an IP 7 of 1,457 BOEPD, 73% oil, or 331 BOEPD per 1,000 feet.
Based on success with the first ESP installation on a mature well in the Northern Delaware area, the Company installed an ESP in April on the Weber 26 G001 well (Lower Wolfcamp A formation) which was first placed on production in January 2017. Shortly after installation of the ESP, the well reached production of 501 BOEPD, which is more than double the rate just prior to installation, representing a significant uplift to the well's forecasted production profile.