Capstone Natural Resources II LLC

:

Permitting Activity


March 27,2018 : Capstone Natural Resources II LLC Permitted the MOUNDS 95-2 2H Horizontal well in Upton,TX : Midland Basin
March 26,2018 : Capstone Natural Resources II LLC Permitted the CRUNCHY SNICKERS 6H Horizontal well in Upton,TX : Midland Basin
March 09,2018 : Capstone Natural Resources II LLC Permitted the GOODBAR 89 5H Horizontal well in Upton,TX : Midland Basin
November 28,2017 : Capstone Natural Resources II LLC Permitted the SNICKERS B 2H Horizontal well in Upton,TX : Midland Basin
November 17,2017 : Capstone Natural Resources II LLC Permitted the GOODBAR 89 3H Horizontal well in Upton,TX : Midland Basin
Click here for More Permits Activity

Completion Activity / Well Results


August 09,2018 : Capstone Natural Resources II LLC completed the CRUNCHY SNICKERS 6H well in Upton,TX with 2 Million lbs of proppant using Slick Water Frac. The Well flowed 275 boe/d which consists of 272 Oil BOPD and 18 Mcf of gas on a 6,219 foot lateral .
July 17,2018 : Capstone Natural Resources II LLC completed the MOUNDS 95-2 2H well in Upton,TX with 2 Million lbs of proppant using Cross Linked/Slick Water Frac. The Well flowed 429 boe/d which consists of 408 Oil BOPD and 120 Mcf of gas on a 6,851 foot lateral .
June 25,2018 : Capstone Natural Resources II LLC completed the GOODBAR 89 5H well in Upton,TX with 2 Million lbs of proppant using Cross Linked/Slick Water Frac. The Well flowed 182 boe/d which consists of 166 Oil BOPD and 91 Mcf of gas on a 5,107 foot lateral .
April 17,2018 : Capstone Natural Resources II LLC completed the SNICKERS B 2H well in Upton,TX with 2 Million lbs of proppant using Hybrid Frac. The Well flowed 448 boe/d which consists of 441 Oil BOPD and 41 Mcf of gas on a 4,156 foot lateral .
February 23,2018 : Capstone Natural Resources II LLC completed the GOODBAR 89 3H well in Upton,TX with 2 Million lbs of proppant using Hybrid Frac. The Well flowed 257 boe/d which consists of 249 Oil BOPD and 48 Mcf of gas on a 5,568 foot lateral .
Click here for More Completion Activity

About


Capstone Natural Resources II LLC company is a private equity backed exploration & production company.The company is backed by funds from subscribe to see

2250 E 73rd Street
Suite 500
Tulsa TX 74136
Phone Number
9182363800






 Drilling Activity ( Jan 2017 - Jul 2025)
Basin
CENTRAL BASIN PLATFORM
MIDLAND BASIN

Personnel (11 people)

-
Manager
Phone : -
-
Administrative Assistant/Production Tech
Phone : -
-
Vice President
Phone : -
-
Vice President Reservoir Engineering
Phone : -
-
Vice President Land
Phone : -
-
Controller
Phone : -
-
Geo/Engineering Tech and Production Analyst
Phone : -
-
President and Chief Operating Officer
Phone : -
-
Vice President
Phone : -
-
Chief Executive Officer
Phone : -
Frist Name Last Name Title Email Phone
Carl Piowaty Manager 918.236.3800
Carol Burger Administrative Assistant/Production Tech 918.236.3800
Clint Brian Vice President 918.236.3800
Douglas S. Farquharson Vice President Reservoir Engineering 918.236.3800
Fred Schantz Vice President Land 918.236.3800
Kim D. Nichols Controller 918.236.3800
Lois Perry Geo/Engineering Tech and Production Analyst 918.236.3800
Michael L. Willis President and Chief Operating Officer 918.236.3800
Patric R. McConn Vice President 918.236.3800
Phillip (Phil) W. Terry Chief Executive Officer 918.236.3800
Vanessa Allen Land Technician and Lease Analyst 918.236.3800

A valid subscription is required to view this information
Please sign in to see the details - Sign In
Need a Subscription?
Click Here to Subscribe
A valid subscription is required to view this information
Please sign in to see the details - Sign In
Need a Subscription?
Click Here to Subscribe

A valid subscription is required to view this information
Please sign in to see the details - Sign In
Need a Subscription?
Click Here to Subscribe
Record Not found


No Results found
Record Not found