Skip to main content

Operator · Argentina : Vaca Muerta & Duvernay Shale

Madalena Energy Inc.

50 articles mentioning Madalena Energy Inc. · Page 2 of 3

Madalena Plans Further Development of Ostracod Domestically

Madalena Plans Further Development of Ostracod Domestically

The Company has gained valuable insights on its emerging Ostracod project on its 58 net section land position.

Madalena Continues HZ Development of Vaca Muerta

Madalena Continues HZ Development of Vaca Muerta

Encouraged by the CAN.xr-2 HZ well, Madalena has commenced a multi-well HZ drilling program for 2014.

Test Wells Come Out Strong for Madalena in Neuquen Basin

Test Wells Come Out Strong for Madalena in Neuquen Basin

During the test period of 75 hours, the total produced cumulative volumes were approximately 3,754 boe (68% oil) gross.

Madalena IPs Neuquen Basin Well Projects; Detail Operational Enhancements

Madalena IPs Neuquen Basin Well Projects; Detail Operational Enhancements

The CAN.xr-2(h) well was recently re-entered and drilled horizontally in the Sierras Blancas light oil reservoir.

Madalena Preps to Frac Paddle River Well; Comes Up Empty at Nordegg

Madalena Preps to Frac Paddle River Well; Comes Up Empty at Nordegg

In 2013, the Company drilled five (4.92 net) wells on the Ostracod project.

Madalena Re-Enters Sierras Blancas Well; Touts Oily Flow Test

Madalena Re-Enters Sierras Blancas Well; Touts Oily Flow Test

Throughout the multi-rate production test, the CAN.xr-2(h) well flowed without artificial lift equipment and was tested for approximately 142 hours at various choke settings.

Madalena IPs Oily Paddle River Well After 16-Stage Frac

Madalena IPs Oily Paddle River Well After 16-Stage Frac

This well was drilled to a total depth of 3,250 metres with a horizontal length of 1,380 metres.

Madalena to Accelerate Argentinean Ops; Extends Exploration Period

Madalena to Accelerate Argentinean Ops; Extends Exploration Period

The remaining work commitments in Coiron Amargo Sur are estimated at approximately USD$ 3.8 million plus VAT (net to Madalena) as of June 30, 2013.

Madalena Tags 1,084 BOE/d at Paddle River Test Well

Madalena Tags 1,084 BOE/d at Paddle River Test Well

This horizontal well is currently shut-in and operations to equip the well for production and tie-in the solution gas to existing Madalena facilities are underway.

Madalena Extends Neuquen Basin Exploration

Madalena Extends Neuquen Basin Exploration

As at June 30, 2013, the Company continues to maintain a strong balance sheet with a positive working capital of $7.7 million.

Madalena Changes Name; Retains Stock Ticker

Madalena Changes Name; Retains Stock Ticker

Madalena Ventures Inc. has changed its name to "Madalena Energy Inc."

Madalena to Delineate Vaca Muerta, Lower Agrio Shales

Madalena to Delineate Vaca Muerta, Lower Agrio Shales

Additionally, Madalena is moving forward with RBC Capital Markets to identify a potential joint venture partner to accelerate operational activities across the block.

Madalena Tags 34.8 Billion BOE Potential at Argentinean Leases

Madalena Tags 34.8 Billion BOE Potential at Argentinean Leases

The main zones of interest for the independent resource evaluation focused on the Vaca Muerta shale, Lower Agrio shale and Basal Quintuco.

Madalena Ups Productive Capability by 900%

Madalena Ups Productive Capability by 900%

Madalena's current productive capability is approximately 2,000 boe/d, representing a 900% increase from the Company's October 2012 production level.

Madalena Well Flows Oil from Sierras Blancas

Madalena Well Flows Oil from Sierras Blancas

This location may be further stimulated in the Sierras Blancas in the future, and also has an approximate 340 foot (or 104 meter) thick section of unconventional Vaca Muerta shale.

Madalena Preps to Drill, Frac 4-5 Paddle River Wells

Madalena Preps to Drill, Frac 4-5 Paddle River Wells

At Paddle River, the Company has recently completed drilling two 100% W.I. horizontal Ostracod oil wells.

Madalena Names New CFO/VP of Finance

Madalena Names New CFO/VP of Finance

Thomas Love is a Chartered Accountant with over 35 years of experience in the oil and gas industry, including both Western Canadian and International experience.

Madalena VP/CFO Resigns

Madalena VP/CFO Resigns

Thomas Love, C.A., has been providing consulting services since the acquisition of Online, and go-forward, will continue to be available to assist the Company during and after the transition period.

Madalena Talks Canadian Paddle River Drilling

Madalena Talks Canadian Paddle River Drilling

With the focus on production growth from its three key resource plays in the Greater Paddle River Area, Madalena continues to move forward on its plan to drill, multi-stage frac and tie-in four to five net...

Madalena Looks to Accelerate Vaca Muerta Drilling

Madalena Looks to Accelerate Vaca Muerta Drilling

In the southern portion of the Coiron Amargo block (Madalena 35% W.I.), Madalena continues to define and quantify the Vaca Muerta shale potential on the block with the recent drilling of the CAS X-5 exploration well.