Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production

Arsenal Drilled Two Alberta Horizontal Wells

printPrint    |   

At Princess Alberta, Arsenal has drilled and tested two 100% working interest horizontal wells. The first well flowed at an average rate of 600 bbls/d of oil and 730mcf/d of gas over a five day test period. The well has been tied in and turned over to continuous production operations. Solution gas production at Arsenal’s Princess facility is capacity-limited. This limitation has required that the well be choked back to 200 bbls/d of oil.

The second well tested at a rate of 170 bbls/d over a 24 hour period. It is anticipated that the second well will be tied in and placed on production by the end of October. It is expected to produce at between one half and one third of its test rate. It is anticipated that alternative processing arrangements for the solution gas should be in place by…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Williston Basin News