Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Well Cost | Well Lateral Length | Production Rates | Initial Production Rates

BNK Petroleum IPs Latest Caney Well, Reduces Cost

printPrint    |   
BNK Petroleum IPs Latest Caney Well, Reduces Cost

BNK Petroleum Inc. has provided an update on its Tishomingo Field, Caney oil shale operations in Oklahoma as well as its Polish shale gas project.

Oklahoma - Tishomingo Field

The Company is currently flowing back the Wiggins 11-2H well following its recent hydraulic fracturing treatment. During this flowback, the Wiggins 11-2H had a 48 hour initial production rate of 550 barrels of oil equivalent per day (BOEPD), of which 355 barrels were oil.

Preliminary data indicates that its production rate is similar to other Caney wells drilled by BNK, in particular the Wiggins 12-8H and Barnes 7-2H wells. An artificial lift system was recently run into the well and is currently being optimised.

The Hartgraves 1-5H well has been drilled and casing has been run and cemented in place. The well has…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in