Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Top Story | Key Wells

Beach Uses Four-Stage Frac at Latest Well; Preps Follow-Up

printPrint    |   
Beach Uses Four-Stage Frac at Latest Well; Preps Follow-Up

Beach Energy Ltd reported an update on the Nappamerri Trough Natural Gas program (NTNG) in ATP 855 and PRLs 33-49 (ex-PEL 218).

Fracture stimulation of Geoffrey-1 and Redland-1 in November 2014 completed the Stage 1 work program in Queensland. Upon the completion of fracture stimulation at Boston-2 (PRL 37), expected in early January 2015, the broader NTNG Stage 1 work program will be finished.

ATP 855

(Beach 46.9% and operator, Icon Energy Ltd 35.1% and Chevron Exploration 1 Pty Ltd 18%)

The Etty-1 vertical well, located approximately 10 kilometres to the east of the successful Halifax-1 well, was fracture stimulated over four stages, one in the Daralingie Formation and three in the Toolachee Formation. The well remains choked back at 24/64” and continues to deliver a strong flow rate of…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Austral-Asia News