Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Drilling / Well Results | Top Story | Key Wells | IP Rates-30-Day | IP Rates-24 Hour | Initial Production Rates

Big Star IPs Wolfcamp A Well at 1,504 BOE/d; Plans Follow-Up

printPrint    |   
Big Star IPs Wolfcamp A Well at 1,504 BOE/d; Plans Follow-Up

Big Star Oil & Gas, LLC announced that its second Howard County Wolfcamp horizontal well, the Open Unit A2H, has been successfully brought on production at a peak daily rate of 1504 boepd (2-phase) and a peak 30-day average of 1321 boepd. 

Based upon data available to Big Star, the Open Unit A2H is the third best horizontal Wolfcamp A producer in the Permian Basin, coming in behind the company's recent Ryder Unit A2H and Pioneer Natural Resources' Sale Ranch 15B 2H.  The Open Unit A2H has a productive lateral length of 7500', and was completed in 39-stages utilizing a total of 11.6 million pounds of proppant.  The 30-day average production consists of 1190 bopd and 786 mcfd.

According to Stella Swanson, Big Star Partner and Vice President Land, the company has a number of nearby…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More IP Rates-24 Hour News

North America News


Permian News