Top Story
E&P's Niobrara Wells Outperform with Upsized Fracs, Mono-Bore Design

In its latest investor presentation, Bonanza Creek Energy outlined its new completion strategy in the Niobrara and how it is boosting the company's well results by ~25% and cutting down on drill times.
To date, the Company has executed seven successful mono-bore wells and plans to utilize this well design for the remainder of its program in 2016.
Recent changes to completion design: More sand - increased sand loading to 1,500 lbs. per lateral foot (originally used 1,000 lbs. per lateral foot) Mono-bore completions - This design removes the cost of the intermediate string of casing and decreases drilling time by approximately one day. It also reduces the completed well cost of an SRL by approximately $100,000 Plug-N-Perf completions to complement mono-bore design Type Curve with New…- ✓ Full news archive — U.S., Canada & international coverage
- ✓ A&D transactions — asset deals, corporate M&A, assets for sale
- ✓ Permits & completions data, plus 900,000+ slides & presentations
More Completion Design News

Today in Completions: DJ Basin Well Hits 1,400 BOEPD IP24 (82% Oil)
Upland Exploration, Inc. has reported a company record IP from its recently completed seven-well pad in the DJ Basin. In Weld County, CO, Upland's Little Lady 22-1NH well…

RPC's Q2 / Outlook: D&C to Decline in 2H19; Zipper Frac, Regional Activity
RPC Inc. reported its Q2 2019 results - here are the highlights. RPC's revenues decreased compared to the prior year primarily due to lower pricing, lower activity levels…

HighPoint's Q1 Drilling Up, Completions Down 40% YOY; Touts Wattenberg Results
HighPoint Resources reported its Q1 2019 results. Here are the highlights. Q1 Summary - Well Activity (gross): Drilled 28 wells / TIL 12 wells in Q1 - up…

Whiting's Q1 Production Only Up 1% YOY Despite +42% Jump in D&C Activity
Whiting Petroleum reported its Q1 2019 results. Here are the highlights from its report and presentation. Q1 Summary - Well Activity (gross): Drilled 34 wells / Completed 27…

Bonanza Creek Completions Up +175% YOY; New High Intensity Stimulations
Bonanza Creek Energy Inc. reported its Q1 2019 results. Highlights from its report and presentation are below. Q1 Summary - Well Activity (gross): Drilled 13 wells / TIL…
North America News

Why $90 Oil Isn’t Bringing Back the Rigs
Higher oil prices are not translating cleanly into a drilling response across U.S. shale, and company disclosures are starting to show why. The issue is not simply capital…

Q1 A&D Transactions Jump to $30B , While Deal Flow Was Down 40%
The first quarter of 2026 has officially defined the "Barbell Era" of American oil and gas. While the total number of deals plummeted by 46% YoY (dropping to…

Western Canada Upstream M&A: Q1 2026 Transaction Report
Western Canadian M&A activity in Q1 2026 was characterized by a 87% decrease in total deal value compared to Q1 2025, totaling $0.8 billion C$. However, transaction volume…

Wright to U.S. Oil Industry: The Price Signal Is Telling You to Drill
Energy Secretary Chris Wright stood in front of the largest gathering of oil executives in the world this morning and delivered a message that was equal parts market…

This Operator Will Chop it's 2026 Rig Count From 34 to 24
ConocoPhillips is setting up 2026 as a lower-intensity, more efficient operating year — with the clearest proof coming from the Lower 48 activity reset following the Marathon integration.…
Rockies News

A Quiet Capital Pattern Is Forming in North American Upstream — and Almost No One Is Talking About It
A handful of recent transactions and capital raises point to a subtle pattern in North American upstream—one that is easy to miss because each event, on its own,…

Permian E&P Bucking The Trend; Plan to Increasing Drilling & Fracs in 2026
Occidental’s 2025 U.S. onshore program is centered on the Permian, with ~$3.5B of Permian CapEx and ~$0.8B in the Rockies, totaling ~$4.3B. This supports ~15 net rigs in…

Whitecap Details 2026 Duvernay & Montney Program
Whitecap Resources reported strong third quarter 2025 operating and financial results, marking its first full quarter following the strategic combination with Veren that closed on May 12, 2025.…

Bakken Midstream Project shelved; as future growth projects thin
Hess Midstream highlighted continued throughput growth across its Williston Basin (Bakken/Three Forks) systems, signaling higher utilization in gas gathering and processing. For producers, the only forward-looking capacity signal…

ARC Resources: Lower 2026 Capex, Higher Volumes
ARC Resources used its third quarter update to reinforce a familiar message to Canadian E&P executives: disciplined capital, structurally better market access, and a growing shareholder return program…