FX Energy Inc. reported that the road and location work at the Company's Tuchola-4K well has been completed.
Rigging up is in process and drilling is expected to begin in approximately two weeks.
Tuchola-4K is an offset location to the Tuchola-3K discovery well drilled in 2013. The Company plans to drill and test the Tuchola-4K well during the first half of 2014. Approximately 110 square kilometers of high definition 3D seismic has been acquired and interpreted in this area. This is part of a total 220 square kilometer seismic program to identify additional targets in the Edge concessions. The Edge concessions, where the Tuchola wells are located, are 100% owned and operated by FX Energy.
