Exploration & Production | Drilling / Well Results | Top Story
FX Eyes Polish Production Upswing; Furthers Well Projects

FX Energy, Inc. has reported that the Lisewo-2 well will be completed for production prior to further testing.
The well was drilled to a depth of 3,779 meters and cased to the top of the Rotliegend target reservoir. A total of 27 meters were cored at the top of the reservoir which showed excellent reservoir quality and gas saturation similar to the Lisewo-1 well. Planned operations call for completing the well for production. At that time a full scale production test will be done to determine the production parameters.
The Lisewo-2 well was drilled to accelerate production from the Lisewo structure originally discovered by the Lisewo-1 well. The Lisewo production facility, scheduled to begin producing before the end of the year, is designed to serve both Lisewo-1 and Lisewo-2, in…
- ✓ Full news archive — U.S., Canada & international coverage
- ✓ A&D transactions — asset deals, corporate M&A, assets for sale
- ✓ Permits & completions data, plus 900,000+ slides & presentations