Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling / Well Results | Capital Markets | Private Equity Activity

Gastar's Latest Hunton Lime Well Exceeds Expectations

printPrint    |   
Gastar's Latest Hunton Lime Well Exceeds Expectations

Gastar Exploration, Inc. has reported that the Mid-Con 7H well in its Hunton Limestone oil play in Oklahoma reached a peak 24-hour gross initial production rate of 906 barrels of oil equivalent per day and subsequently averaged 782 BOE per day (60% crude oil) over the following 17 days. 

The Mid-Con 7H well is flowing these rates naturally through 4.5-inch production casing as compared to the previously announced wells which were flowing through production tubing with the assistance of gas-lift.  The well was completed in the Hunton Limestone formation utilizing a 19-stage fracture stimulation over the well's lateral length of 4,250 feet. Gastar has a 48% working interest (38% net revenue interest) in this non-operated horizontal well drilled within an area of mutual interest in…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in