Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Well Lateral Length | Drilling / Well Results | Quarterly / Earnings Reports | Third Quarter (3Q) Update | IP Rates-30-Day | IP Rates-24 Hour | Drilling Activity

Lilis Bolsters Production +234% YOY at 5,588 BOEPD; IPs First 1.5-Mile Wolfcamp A Well

printPrint    |   
Lilis Bolsters Production +234% YOY at 5,588 BOEPD; IPs First 1.5-Mile Wolfcamp A Well

Lilis Energy reported its Q3 2018 results.

Strong Production Growth - Up +234% YOY / +16% from 2Q18

- Q3 sales volume of 514,102 BOE or 5,588 Boepd - up +234% YOY and up +16% from 2Q18

  • This is excluding 349 Boepd of production acquired in the fourth quarter but produced in the third quarter of 2018)
  • Current production at 7,000 Boepd
  • Exit rate guidance 8,000 Boepd reaffirmed

First 1.5-Mile Wolfcamp A Well / Other Drilling Activity

  • Lilis drilled its first 1.5-mile lateral Wolfcamp A well - it had an IP24 of 1,691 BOEPD and an IP30 of 1,035 BOEPD.

 

Current Updates

  • Six upcoming wells, two in flowback, two in completion and two drilling, expected to be on-line in 2018 and early 2019

  • Total location count is now 1,175, of which approximately 54% represent Wolfcamp locations and 28% represent Bone Spring locations, with approximately 80% of these located in Western Texas and New Mexico acreage

  • Approximately 700 of our locations are longer lateral locations (> 1 mile lateral length)

More Third Quarter (3Q) Update News

Permian News


Permian - Delaware Basin News