Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Drilling & Completions | Well Lateral Length | Drilling / Well Results | Key Wells | IP Rates-30-Day | Initial Production Rates | Drilling Activity

PetroShale Touts Oily New Well IPs in the Bakken

printPrint    |   
PetroShale Touts Oily New Well IPs in the Bakken

PetroShale reported an update on its recent wells in the Williston Basin.

PetroShale has drilled and completed four (3.7 net) new wells on two operated drilling spacing units ("DSUs"), being "Primus" in the Antelope area and "Horse Camp" in the South Berthold area of the North Dakota Bakken.

Primus Wells

The Primus "3H" well was completed with a 9,550 foot long lateral in the Bakken formation and started producing on a production test on March 5.

The 3H well produced at an average rate for the last 28 days of approximately 1,880 BOEPD including 1,466 barrels of oil per day BOPD  and 2.5 million cubic feet of gas per day Mmcf/d.

The Primus "4H" well was completed with a 7,120 foot long lateral in the Three Forks formation and started producing on a production test on March 6.

The 4H…
Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More Well Results - Positive News

Williston Basin News