Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling & Completions | Top Story

Post Flow Back Incident, Questerre Preps Montney Well Test

printPrint    |   
Post Flow Back Incident, Questerre Preps Montney Well Test

Questerre Energy Corporation has reported that its well at 15-01-62-06-W6M in the Kakwa-Resthaven area of west central Alberta is being prepared for testing.

The Well was completed in the target interval of the Montney formation with a multi-stage water-based nitrogen foam fracture stimulation in the 1200m horizontal leg. During initial flow back, equipment failure resulted in an uncontrolled release of completion fluids and gas for approximately 48 hours. The Well was subsequently brought under control and workover operations commenced in mid-February to prepare the Well for further testing.

Heavy weight drilling fluids were circulated to maintain pressure control during operations to retrieve the damaged production casing and other downhole equipment. Production tubing will be run…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Canada News