Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Top Story | Key Wells | IP Rates-30-Day | Initial Production Rates | Today In Completions

Private E&P Touts Another Marmaton Monster Well; 30-Day IP 4,164 Boe/d with 56% Oil

printPrint    |   
Private E&P Touts Another Marmaton Monster Well; 30-Day IP 4,164 Boe/d with 56% Oil

  NGP-backed Tecolote Energy reported another monster well completed in the Marmaton formation.   The Tecolote operated Little-Pyeatt 30-19 ME WX 1H extended lateral well was completed utilizing NEXTGEN completion technology in 9,518 feet of productive lateral within the Marmaton ‘E’ and achieved the highest 30-day initial production rate from the POWER play to date. The well produced at a 30-day initial production rate of 4,164 barrels of oil equivalent per day (“Boepd”) of which 55% of the production was comprised of oil and natural gas liquids. Production on a 24-hour basis peaked at 4,481 barrels of oil equivalent per day.

The Little-Pyeatt well provides confirmation that the play extends another 14 miles to the northwest of the previously announced Meadows-Clifford pad which includes…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in

More Today In Completions News

Mid-Continent - Anadarko Basin News