Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production

Questerre Energy Second High Liquids Montney Well Tests at 1,800 boe/d

printPrint    |   

Questerre Energy Corporation is pleased to report on the test results from its second Montney horizontal well in the Kakwa-Resthaven area of west central Alberta.

The well was successfully completed with a 14 stage water-based nitrogen foam fracture stimulation in the 1230m horizontal section. Initial clean up and flow back began on October 31, 2012 and the well was tested for a 96-hour period thereafter against a gathering system pressure of approximately 1100 psi.

Over the last 24 hours of the production test, the well flowed 974 bbl/d of condensate and 4.97 MMcf/d of natural gas at a flowing casing pressure of approximately 7500 kPa (1100 psi) on choke sizes ranging from 16.67 mm to 15.08 mm. A subsequent four-hour test was completed to determine the free-flowing capability of the well…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Canada News