Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Operational Updates | Drilling / Well Results | Top Story | Key Wells | IP Rates-24 Hour | Initial Production Rates

Rex Touts Strong Liquids Results at Moraine; IDs Completion Design

printPrint    |   
Rex Touts Strong Liquids Results at Moraine; IDs Completion Design

Rex Energy Corporation announced initial production test results from the company's first two wells in the Moraine East Area, the Renick 2H (Marcellus) and the Renick 3H (Upper Devonian Burkett).

As previously announced, the company finished completion operations on the four-well Renick pad, consisting of three Marcellus wells and one Upper Devonian Burkett well. The Renick 2H was drilled to a lateral length of approximately 6,000 feet and completed in 40 stages with sand concentrations of 2,300 pounds per foot. The Renick 2H produced at a 24-hour test rate, assuming full ethane recovery, of approximately 6.6 MMcfe/d, consisting of 3.0 MMcf/d of natural gas, 566 bbls/d of NGLs and 47 bbls/d of condensate. At the time the Renick 2H was shut in, the well was still cleaning up and continuing…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in