Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Top Story | Capital Markets | Private Equity Activity

Samson Intersects Middle Bakken at Coopers Well; Talks Project Progress

printPrint    |   
Samson Intersects Middle Bakken at Coopers Well; Talks Project Progress

Samson Oil & Gas Limited has reported an update on its North Stockyard Project in Williams County, North Dakota.

Coopers 2-15-14HBK and Tooheys 2-15-14HBK wells (SSN WI 27.7%)

The lateral portion of the Coopers well was successfully drilled to a total measured depth of 17,685 feet. The lateral remained wholly within the middle Bakken Formation. Currently the 7 inch production liner is being run.

Once the production liner has been set, the rig will skid over to the Tooheys well to drill out the lateral portion of the well.

Billabong 2-13-14HBK well (SSN WI 24.86%)

Key Energy Services Rig 370 moved onto location late last week to begin work over operations to retrieve the remaining drill pipe. Wireline operations indicate that the internal diameter of the drill pipe is free of cement which…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Williston Basin News