Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Operational Updates | Frac Markets - Frac Trends | Key Wells

Strike Preps Klebb Wells for Production; Plans Le Chiffre Flow Test

printPrint    |   
Strike Preps Klebb Wells for Production; Plans Le Chiffre Flow Test

Strike Energy Limited reported an update on operations at its Southern Cooper Basin Gas Project in PEL 96 (Strike 66.7% and Operator, Energy World Corporation 33.3%).

Program Overview

Operations to enhance the water and gas production capacity of the 3 Klebb wells are well underway (Phase 3 flow test program). The work program comprises the following activities:

Klebb 1

The current jet pump will be replaced with a rod pump. This will allow fixed water production rates to be maintained at lower reservoir pressures and will also facilitate down‐hole gas separation, further reducing back‐pressure on the well. The maximum water rate attainable with the beam pump is expected to be similar to the rates achieved with the jet pump of around 500 bwpd.

Klebb 2 and 3

The Vu Upperzone at Klebb 2 and…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More Operational Updates News

Austral-Asia News