Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Operational Updates | Key Wells

Strike Wraps Up Workover Ops at Cooper Basin Klebb Project

printPrint    |   
Strike Wraps Up Workover Ops at Cooper Basin Klebb Project

Strike Energy Limited reported an update on operations at its Southern Cooper Basin Gas Project in PEL 96 (Strike 66.7% and Operator, Energy World Corporation 33.3%).

Program Status

Workover operations at the three Klebb wells have been successfully completed. Each well has been fully re‐commissioned with the Phase 3 extended flow test program having commenced last week.

Forward Plan

Flow rates at each well will be ramped up in a controlled manner over coming weeks based on procedures developed over the previous 6 months of testing.

Early water and gas flow results are encouraging with sustained gas flows observed at each well shortly after commencement of water production. Initial results also show that well productivity has been substantially increased following the fracture stimulation…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More Operational Updates News

Austral-Asia News