Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling & Completions | Top Story

Target Advances Duo of Wolfberry Well Projects; IDs Pay Zone

printPrint    |   
Target Advances Duo of Wolfberry Well Projects; IDs Pay Zone

Target Energy Limited has reported an update on its Fairway Project in West Texas.

Wagga Wagga #1 (Final Report)

Wagga Wagga #1 has reached Total Depth at 3,057m (10,030 ft). Wireline logs have been run and production casing set and cemented. The rig has been released.

Darwin #3

Following the fracture stimulation program over the Lower Wolfberry section at Darwin #3, the well is being flowed back. Approximately 30% of the load-water (12,900 barrels were used during the stimulation process) has now been recovered with an increasing oil-cut.

Target Managing Director Laurence Roe commented on the drilling, "Wagga Wagga #1 encountered good oil and gas shows in the lower Wolfberry section and a preliminary log analysis confirms potential pay there along with potentially productive zones in the…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Permian News