Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production

Target Marks Progress at Three Permian Well Projects

printPrint    |   
Target Marks Progress at Three Permian Well Projects

US-focused oil and gas producer Target Energy Limited has reported an update on its Fairway operations.

Highlights: Drilling at BOA North #5 in Howard County has successfully concluded with production casing being run in the well. Target has a 50% Working Interest.  Drilling at the Taree 193 #1 well in Glasscock County has commenced with the well presently drilling ahead at 1,921m. Target has a 50% WI in Taree #1 which is situated approximately 2 km south east of the Ballarat 185 #1 well. The well will be drilled to a planned depth of 3,048m (10,000 ft) and will test both Fusselman and Wolfberry targets.  Fracture stimulation at BOA North #4 was undertaken on 12 August 2014. The well was put on pump on 23 August 2014 and is now flowing back. Target has a 50% WI in the BOA North #4 well.

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Permian News