Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling & Completions

Target Zips Up Frac Ops at Well Targeting Wolfberry Play

printPrint    |   
Target Zips Up Frac Ops at Well Targeting Wolfberry Play

Target Energy Limited has reported an operations update on its Fairway Project in West Texas .

The Homar #1 well (Target has a 60% Working Interest) is presently drilling ahead at 2,710 m (8,890 ft). Total Depth of the well is planned at 3,230 m (10,600 ft) and will test the Wolfberry section. Drilling operations commenced on 5 May 2014, with the well expected to reach its Total Depth within the week.  Following the conclusion of drilling at Homar #1, the drill rig will immediately move to the Ballarat lease, approximately 5 kms east of the Sydney lease. The Ballarat 185 #1 well will be drilled to a planned Total Depth of 3,350 m (11,000 ft) and will test Fusselman and Wolfberry targets. Target has a 60% Working Interest in the Ballarat lease.  At BOA 12 #3 (Target has a 60% Working…
Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Permian News