Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling / Well Results | Deals - Joint Ventures

Viking, Tanager Reactivating Wells at Joffre Project

printPrint    |   
Viking, Tanager Reactivating Wells at Joffre Project

Viking Investments Group Inc. has reported an update on its Joffre Project.

The Joffre Project, in which Viking has a 50% working interest, is located in Red Deer, Alberta and consists of 4 previously suspended oil wells and 1 suspended water injection well. As previously announced, Viking and Tanager Energy Inc., joint venture operator of the Joffre Project, intend to mobilize and reactivate each well sequentially.

The first well in the project was placed on production on April 1st, 2015. After 5 days of anticipated monitoring and operating facility adjustments, the well produced at a rate of 118barrels of oil per day and 250 mcf of natural gas, totaling 160 BOE/D, without a pump jack. To preserve the longevity of the well and sustain consistent production over an extended period Tanager and Viking stopped production in order to install a pump jack on the well which is expected to be completed before the end of June, 2015.

Upon completion of the recently announced financing, Viking and Tanager intend to proceed with the work necessary to reactivate the second of the remaining oil wells in the Joffre project. The second well is expected to be on production in August, 2015. Other wells will be mobilized and reactivated sequentially.


More Deals - Joint Ventures News

Canada News