Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling / Well Results | Top Story | IP Rates-30-Day | Initial Production Rates

Yangarra Unveils Cardium 30-Day Well IPs; Talks Design

printPrint    |   
Yangarra Unveils Cardium 30-Day Well IPs; Talks Design

Yangarra Resources Ltd. reported an operations update on cemented liner and drilling operations.

Yangarra drilled two Cardium wells (1 mile laterals) in 2015 from the same surface pad using cemented liner and sliding sleeves, the first as an 18 stage well and followed up with a 30 stage well. Initial production for the first 30 days was 158 boe/d and 190 boe/d (both 91% oil), respectively, which is approximately a 25% and 50% improvement over 18 stage ball drop systems in the immediate area.

The Company's half cycle rates of return (IRR) on type wells in 41-07W5M area of Willesden Green are now greater than 55% with payouts of less than 1.5 years (based on current strip commodity pricing), due to the lower service costs and incremental production from the cemented liners. The 41-07W5M…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More IP Rates-30-Day News

Canada News