Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

  Economics : Rates of Return/ IRR

Showing 3 Results


Industry Leading Inventory Additions Nov. 25 Added Locations1 Added 3,200 Locations since 2023 NuVista Energy Alberta Montney 930 1.3 MM/loc Nov. 24 Montney Paramounts Alberta Montney Assets 900 <1.0 MM/loc April 23 EnCaps Midland Basin Assets 1,050 2.0 MM/loc Permian 23 25 Permian & Montney Ground Game 350 85% Permian <1.5 MM/loc 5 1) Net 10k locations. Includes Premium locations, which reflect 35% IRR at 55/bbl WTI and 2.75/MMBtu NYMEX, and upside locations.
Ovintiv Inc
February 2026

Integrated Workflow Identifying Opportunities Optimizing well design to maximize returns 2019 results (300 m interwell, 3 T/m) 280 Attachie West Upper Montney Type Curve (300 m interwell, 3 T/m) Cumulative Condensate (Mbbl)1, 2 240 2018 results (150 m interwell, 2 T/m) 200 160 Type Curve Economics 120 DCET Capital 9.7 MM 80 IP365 735 boe/d 40 EUR 1,050 Mboe 0 0 5 10 15 20 25 30 35 40 45 50 55 60 IRR 70% Months Attachie design is based on performance from 2019 design. 2018 results had lower production per well and higher recovery per pad, showing opportunity for greater reserves recovery. 32 1) Type curve based on representative 2,550 meter lateral length. 2) Economics at US70/bbl WTI and C3.50/GJ AECO.
Arc Resources Ltd.
September 2025

30 Gas Development Location Inventory and Economics(1) Mar 2025 AB Deep Basin AB Deep Basin NEBC Gundy NEBC North NEBC South PRH PRH North & West South MNTN MNTN MNTN Charlie Lake Montney Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal Total Well Costs (Drill, Case, Complete, Million) 5.31 5.81 4.63 4.49 5.53 3.10 4.39 Average Reserves/Well (bcfe) 6.8 5.6 5.1 7.7 6.6 2.5 3.4 Lateral Length (metres) 2,250 2,900 2,300 2,400 2,650 2,250 2,250 Year 1 Production Rate (2) 5.4 mmcfepd 3.8 mmcfepd 4.3 mmcfepd 4.5 mmcfepd 4.4 mmcfepd 262 boepd 568 boepd Development Cost/boe 4.69 6.20 5.41 3.50 5.00 7.53 7.77 Operating Expenses/boe (3) 3.23 4.92 2.14 6.37 2.49 9.10 7.53 Net Present Value 10% (000's) 6,001 6,003 8,768 9,012 8,268 4,811 4,124 Internal Rate of Return (4) 76% 63% 338% 184% 104% 146% 124% Payback Period (months) 17 18 7 10 14 10 12 Year 1 Gas Price (5) 2.11 2.27 1.95 1.90 2.05 2.04 2.04 Future Development Locations (6) 14,267 527 1,188 2,901 2,820 1,274 920 Notes: (1) All amounts are before tax. (2) Assumes on production date of January 1, 2025. (3) Average operating expenses over the initial five years of production. (4) Internal Rate of Return calculation is based on monthly cash flows. (5) Independent Reserve Engineer January 1, 2025 escalated price forecast, adjusted for transportation, quality and heat content. (6) See Schedule A.
Tourmaline Oil Corp.
March 2025

   Want More Data?
Subscribe and Get immediate Access

Already a subscriber?Log In here