Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Production Start Up

CNOOC Turns on Taps at Luda 6-2 Project in the Bohai Sea

emailEmail    |    printPrint    |    bookmarkBookmark
   |    Wednesday,August 25,2021

CNOOC Limited announced that Luda 6-2 oilfield has commenced production ahead of schedule.

Luda 6-2 oilfield is located in Liaodong Bay of Bohai Sea, with average water depth of about 30 meters. In addition to fully utilizing the existing processing facilities of Suizhong 36-1 oilfield, the project has built a new central platform. A total of 38 development wells are planned, including 29 production wells, 8 water injection wells and 1 development and appraisal well. The project is expected to reach its peak production of approximately 10,000 barrels of crude oil per day in 2022.

CNOOC Limited holds 100% interest in Luda 6-2 Oilfield and acts as the operator.


Related Categories :

Production Start Up   

More    Production Start Up News

Asia - Pacific News >>>