CNOOC Limited announced that Luda 6-2 oilfield has commenced production ahead of schedule.
Luda 6-2 oilfield is located in Liaodong Bay of Bohai Sea, with average water depth of about 30 meters. In addition to fully utilizing the existing processing facilities of Suizhong 36-1 oilfield, the project has built a new central platform. A total of 38 development wells are planned, including 29 production wells, 8 water injection wells and 1 development and appraisal well. The project is expected to reach its peak production of approximately 10,000 barrels of crude oil per day in 2022.
CNOOC Limited holds 100% interest in Luda 6-2 Oilfield and acts as the operator.
Related Categories :
Production Start Up
More Production Start Up News
-
Murphy Achieves First Oil at GOM Khaleesi, Mormont and Samurai Projects
-
ExxonMobil Begins Production at Stabroek Liza Unity Offshore Guyana; Will Hit 220,000 BOPD
-
CNOOC Begins Production at Liuhua 29-2 Gas Field
-
CNOOC Turns on Taps at Caofeidian Project Using Low Carbon Strategy; 15 MBO/d by 2023
-
CNOOC-Conoco JV Penglai Project Begins Production Offshore China
Asia - Pacific News >>>
-
ConocoPhillips Finalizes Sale of Indonesian Assets to MedcoEnergi for $1.355B -
-
ConocoPhillips Bolsters Spending by 30% for 2022; Bets Bulk on Lower 48 -
-
EQT Brings on Two New Execs Focused on Investments in Japan
-
CNOOC Begins Production at Liuhua 29-2 Gas Field
-
Chevron Inks LNG Deal with Hokkaido Gas Co. -