Midstream - Pipelines | Government & Regulatory | Midstream - Transportation & Pipelines
Canada's NEB Issues Pipeline Material Disclosure Ordinance
The National Energy Board (NEB) has issued Board Order MO-01-2016 (Order) that directs NEB-regulated companies to identify and report on the potentially substandard materials being used during pipeline construction and operation. Issuance of the Order is not indicative of an imminent risk to pipeline safety, but rather a proactive measure to enhance pipeline safety.
The NEB is aware of circumstances during which materials used in the production of pipe and pipe fittings do not meet Canadian Standards Association (CSA) or other requirements. The prevalence of their use in Canada is currently unknown.
NEB-regulated companies are required to respond to the Order within 60 days with the following information:
- Identification of all fittings in use that have been manufactured by Canadoil Asia with production originating in Thailand with specific details regarding the fitting type, grade, year of manufacture and location, products transported and maximum operating pressure.
- Identification of all Grade 550 fittings in use that have been manufactured byEZEflow Group from 2005 to 2008 with specific details regarding the fitting type, year of manufacture and location, product transported and maximum operating pressure.
- Detailed mitigation measures and timelines to complete an engineering assessment of pipe or fittings known, or suspected, to have substandard material properties
Additionally, the NEB has issued two Safety Advisories–Safety Advisory 2016-01: Standard for Manufactured Pipe and Fittings and the Potential for Substandard Material Properties and Safety Advisory 2016-02: Thermal Expansion Pipeline Design and Operating Considerations.
The Safety Advisories provide guidance to regulated companies and the pipeline industry to address the use of substandard materials that may not meet material standards and to reinforce the need for companies to consider thermal expansion during pipeline design and operation, respectively.
NEB Board Orders are enforceable. NEB Safety Advisories are issued as guidance to regulated companies and industry in general.
More Government & Regulatory News

EIA’s “Glut” Calls: The 2025 Surplus Claim — and How 2021–2024 Forecasts Actually Held Up
The “~2.2 MMb/d glut in 2025” framing traces to the EIA’s Short-Term Energy Outlook (STEO), December 2025. EIA doesn’t usually write “glut” in the tables—what they publish is…

Dallas Fed Energy Survey: What Oil and Gas Executives Are Really Saying
The latest Dallas Fed Energy Survey shows a U.S. oil and gas industry that is not collapsing—but is clearly constrained. Executives are operating in a defensive posture, focused…

MEG Energy Rejects Strathcona Resources' $6 Billion Takeover Offer
MEG Energy Rejects Strathcona Resources' $6 Billion Takeover Offer Overview of the Offer: Bidder: Strathcona Resources Ltd. Offer: 0.62 Strathcona shares + $4.10 in cash per MEG share…

PDC Energy Second Quarter 2022 Results
PDC Energy, Inc. announced its 2022 second quarter financial and operating results, and provided second half 2022 guidance. The company also announced receiving Completeness Determination on the Guanella…

PDC Energy's 69-Well Kenosha Project Approved by COGCC
PDC Energy Inc. reported that the Colorado Oil and Gas Conservation Commission (COGCC) approved the Company's Kenosha Oil & Gas Development Plan (OGDP) permit application. The Kenosha OGDP,…
Canada News

Western Canada Upstream M&A: Q1 2026 Transaction Report
Western Canadian M&A activity in Q1 2026 was characterized by a 87% decrease in total deal value compared to Q1 2025, totaling $0.8 billion C$. However, transaction volume…

Canadan E&P 2026 Program Calls for 448 Net Wells, Up 24% vs. 2025 Plan
Canadian Natural Resources outlined a 2026 operating capital budget of approximately $6.3 billion (total capital budget $6,425 million, including $125 million for carbon capture) targeting 1,590–1,650 MBOE/d of…

EIA’s “Glut” Calls: The 2025 Surplus Claim — and How 2021–2024 Forecasts Actually Held Up
The “~2.2 MMb/d glut in 2025” framing traces to the EIA’s Short-Term Energy Outlook (STEO), December 2025. EIA doesn’t usually write “glut” in the tables—what they publish is…

Whitecap Details 2026 Duvernay & Montney Program
Whitecap Resources reported strong third quarter 2025 operating and financial results, marking its first full quarter following the strategic combination with Veren that closed on May 12, 2025.…

ARC Resources: Lower 2026 Capex, Higher Volumes
ARC Resources used its third quarter update to reinforce a familiar message to Canadian E&P executives: disciplined capital, structurally better market access, and a growing shareholder return program…
North America News

Baytex 2026 Development Plans
Baytex’s 2026 development plan reflects a post–Eagle Ford sale capital program and a sharpened focus on its core Canadian assets. The Company approved 2026 exploration and development expenditures…

Tourmaline: 2026 Capital Program Locked In at $2.9B
Tourmaline’s 2026 exploration and production (EP) program is set at $2.9 billion and targets average production of 690,000–710,000 boepd, with the company maintaining the multi-year EP Plan released…

Cenovus Outlines 2026 Development Plan Following MEG Integration
Cenovus’ 2026 plan targets capital investment of $5.0 billion to $5.3 billion (including ~$350 million of capitalized turnaround costs) and upstream production of 945,000 BOE/d to 985,000 BOE/d,…

Gran Tierra Energy To Step Down Activity in 2026
Gran Tierra Energy’s 2026 development plan reflects a step-down in spending and activity as the company transitions from fulfilling Ecuador exploration commitments in 2025 toward a free-cash-flow-focused program.…

Advantage Plans $300–$330MM 2026 Capital Program
Advantage’s 2026 development plan centers on Glacier-focused drilling and key midstream work. The company plans total capital spending of $300 million to $330 million and expects production to…