Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling / Well Results

Crown Point Suspends Argentine Test Well for Winter

printPrint    |   
Crown Point Suspends Argentine Test Well for Winter

Crown Point Energy Inc. has advised that it has suspended completion and evaluation operations on the La Hoyada x-1 well for the duration of the Argentine winter.

Crown Point plans to return to the well after winter to install pumping equipment and conduct a long term production test.

Seven Vaca Muerta igneous intrusives totaling 51 metres in thickness were perforated and tested.

The 7 intervals, after perforating, swab tested stabilized fluid rates of (in order from bottom to top): 1.5 bbls/day formation water with oil shows and emulsion; 4.5 bbls/day formation water with oil shows and emulsion; 12 bbls/day formation water with 14% oil and gas shows; dry; 73 bbls/day formation water and some gas; and the last two were swabbed together testing a stabilized rate of 226 bbls/day of…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Latin America News