Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Top Story | Production Start Up

ExxonMobil Initiates Production at Hadrian South Project

printPrint    |   
ExxonMobil Initiates Production at Hadrian South Project

Exxon Mobil Corporation began production in the deepwater Gulf of Mexico at Hadrian South with facilities tied back to the nearby Lucius project, reducing additional infrastructure requirements.

Daily gross production from Hadrian South, ExxonMobil’s deepest subsea tie-back in nearly a mile and a half of water, is expected to reach approximately 300 million cubic feet of gas and 3,000 barrels of liquids from two wells.

Hadrian South is a subsea production system with flowlines connected to the Anadarko-operated Lucius truss spar, which started production in January. With the startup of Hadrian South and Lucius, ExxonMobil’s total Gulf of Mexico net production capacity has increased by more than 45,000 oil-equivalent barrels per day. ExxonMobil holds a 46.7 percent interest in Hadrian…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in