Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Top Story | Production Start Up

ExxonMobil Turns on Taps at Angola Kizomba Project

printPrint    |   
ExxonMobil Turns on Taps at Angola Kizomba Project

Exxon Mobil Corporation reported that its subsidiary, Esso Exploration Angola (Block 15) Limited (Esso Angola), has started oil production ahead of schedule at the Kizomba Satellites Phase 2 project offshore Angola.

Kizomba Satellites Phase 2 is a Block 15 subsea infrastructure development of the Kakocha, Bavuca and Mondo South fields. Mondo South is the first field to begin production, and the other two satellite fields are expected to start up in the coming months.

The project develops approximately 190 million barrels of oil with peak production currently estimated at 70,000 barrels of oil per day. The project is expected to increase total daily Block 15 production to 350,000 barrels. Esso Angola is operator of the project and Block 15.

The project optimizes the capabilities of…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in