Exploration & Production | Drilling / Well Results | Key Wells
Petrolia Completes Drilling on Haldimand 4

Pétrolia has announced that the drilling phase of the Haldimand 4 well was completed on December 30th.
The drilling was conducted within budget and in accordance with engineering projections. Drilling started on November 25th and was completed in 35 days, which met the predicted schedule. Haldimand 4 is a horizontal well, which was drilled without hydraulic fracturing, and has a total length of 2630 meters. The drilling of the Haldimand 4 well represents an important step in the exploration work necessary to bring this reservoir on production.
At 400 meters, in order to intercept the maximum of natural fractures, the drilling was gradually deviated in a southeast direction until it reached an angle of 78 degrees from vertical. From there, the 2 kilometers length lateral drain was oriented…
- ✓ Full news archive — U.S., Canada & international coverage
- ✓ A&D transactions — asset deals, corporate M&A, assets for sale
- ✓ Permits & completions data, plus 900,000+ slides & presentations
More Key Wells News

Comstock Delivers Strong Q1 2025 — Olajuwon Pickens #1 Steals the Spotlight
Comstock Resources entered 2025 with renewed momentum as it resumed completions and posted a solid financial and operational performance in the first quarter — but it was the…

Kolibri Preps to Drill Three Wells at SCOOP Prospect
Kolibri Global Energy Inc. provided an update on its operations located in the Company’s Tishomingo field in Oklahoma. Operations The Company has completed the location work for the…

APA Corp. Strikes Oil Offshore Suriname at Baja-1 Well; Dry Hole at Block 58
APA Corp. announced an oil discovery offshore Suriname at Baja-1 in Block 53 and provided an update on recent drilling operations at Dikkop-1 in Block 58. Baja-1 was…

APA Corp. Hits Pay at Krabdagu Exploration Well Offshore Suriname
APA Corp. announced flow test results from the Krabdagu exploration well (KBD-1) on Block 58 offshore Suriname. APA Suriname holds a 50% working interest in the block, with…

ExxonMobil, Murphy Come Up Empty at Cutthroat-1 Well Offshore Brazil
Murphy Oil Corp. and ExxonMobil announced that drilling has concluded at the Cutthroat-1 exploration well in block SEAL-M-428 in the Sergipe-Alagoas Basin offshore Brazil. While the presence of…
Canada News

Western Canada Upstream M&A: Q1 2026 Transaction Report
Western Canadian M&A activity in Q1 2026 was characterized by a 87% decrease in total deal value compared to Q1 2025, totaling $0.8 billion C$. However, transaction volume…

Canadan E&P 2026 Program Calls for 448 Net Wells, Up 24% vs. 2025 Plan
Canadian Natural Resources outlined a 2026 operating capital budget of approximately $6.3 billion (total capital budget $6,425 million, including $125 million for carbon capture) targeting 1,590–1,650 MBOE/d of…

EIA’s “Glut” Calls: The 2025 Surplus Claim — and How 2021–2024 Forecasts Actually Held Up
The “~2.2 MMb/d glut in 2025” framing traces to the EIA’s Short-Term Energy Outlook (STEO), December 2025. EIA doesn’t usually write “glut” in the tables—what they publish is…

Whitecap Details 2026 Duvernay & Montney Program
Whitecap Resources reported strong third quarter 2025 operating and financial results, marking its first full quarter following the strategic combination with Veren that closed on May 12, 2025.…

ARC Resources: Lower 2026 Capex, Higher Volumes
ARC Resources used its third quarter update to reinforce a familiar message to Canadian E&P executives: disciplined capital, structurally better market access, and a growing shareholder return program…