Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling / Well Results | Key Wells

Petrolia Completes Drilling on Haldimand 4

printPrint    |   
Petrolia Completes Drilling on Haldimand 4

Pétrolia has announced that the drilling phase of the Haldimand 4 well was completed on December 30th.

The drilling was conducted within budget and in accordance with engineering projections. Drilling started on November 25th and was completed in 35 days, which met the predicted schedule. Haldimand 4 is a horizontal well, which was drilled without hydraulic fracturing, and has a total length of 2630 meters. The drilling of the Haldimand 4 well represents an important step in the exploration work necessary to bring this reservoir on production.

At 400 meters, in order to intercept the maximum of natural fractures, the drilling was gradually deviated in a southeast direction until it reached an angle of 78 degrees from vertical. From there, the 2 kilometers length lateral drain was oriented…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More Key Wells News

Canada News