Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Well Cost | Quarterly / Earnings Reports | Third Quarter (3Q) Update | Drilling Program - Wells | Drilling Activity | Drilling Program

Sanchez Maintaining Two Rig Eagle Ford Program; Tweaks Completion Design

printPrint    |   
Sanchez Maintaining Two Rig Eagle Ford Program; Tweaks Completion Design

Sanchez Energy announced operating results for the third quarter 2016.

Key Points: New generation of completion design that involves tighter cluster spacing and increased fluid and proppant loading During the third quarter 2016, the Company spud 21 gross (20.5 net) wells and completed 19 gross (19 net) wells.  Running two rigs at Catarina and one rig at Cotulla and had 676 gross (558 net) producing wells with 19 gross (17 net) wells in various stages of completion Catarina Stats Q3 Maverick Stats Q3 Highlights include: Third quarter 2016 production of approximately 4.7 million barrels of oil equivalent, or approximately 51,500 barrels of oil equivalent per day, was at the high end of Company's 50,000 to 52,000 Boe/d guidance for the quarter;
  New generation of completion design…
Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More Third Quarter (3Q) Update News

Gulf Coast - South Texas News