Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Quarterly / Earnings Reports | Third Quarter (3Q) Update | Production Rates | Capital Markets | Capital Expenditure | Drilling Program - Wells | Drilling Program

SandRidge Touts NorthWest STACK 30-Day IPs; 2018 Development Plan

printPrint    |   
SandRidge Touts NorthWest STACK 30-Day IPs; 2018 Development Plan

SandRidge reported its Q3 2017 results. Highlights from its call / release include:

Production for the third quarter was 3.6 MMBoe Three rigs running (2 STACK / 1 Niobrara) North Park Niobrara

"Turning to the North Park Basin objective on the right side of the page, we commenced drilling here at the end of the second quarter. This program is expanding the resource in North Park Basin. In the Niobrara we have now confirmed production from all four benches. If you recall, in 2016, we drilled primarily the D and the C benches, and now we've confirmed production from the more shallow A and B benches, additional wine rack spacing test in Q4 2017, and into 2018 will also confirm additional production." On the cost side we're now pad drilling two-mile laterals for $6.7 million, this…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More Drilling Program - Wells News

Mid-Continent - Anadarko Basin News


Rockies News

Permian E&P Bucking The Trend; Plan to Increasing Drilling & Fracs in 2026

Premium content Permian E&P Bucking The Trend; Plan to Increasing Drilling & Fracs in 2026

Occidental’s 2025 U.S. onshore program is centered on the Permian, with ~$3.5B of Permian CapEx and ~$0.8B in the Rockies, totaling ~$4.3B. This supports ~15 net rigs in…

Bakken Midstream Project shelved; as future growth projects thin

Premium content Bakken Midstream Project shelved; as future growth projects thin

Hess Midstream highlighted continued throughput growth across its Williston Basin (Bakken/Three Forks) systems, signaling higher utilization in gas gathering and processing. For producers, the only forward-looking capacity signal…

Japex Enters DJ Basin with Acquistion of Verdad

Japex Enters DJ Basin with Acquistion of Verdad

Japan Petroleum Exploration Co., Ltd. (JAPEX) has announced a major expansion into North American shale with a $1.3 billion acquisition of Verdad Resources Intermediate Holdings LLC (VRIH), marking…

Dallas Fed Energy Survey: What Oil and Gas Executives Are Really Saying

Dallas Fed Energy Survey: What Oil and Gas Executives Are Really Saying

The latest Dallas Fed Energy Survey shows a U.S. oil and gas industry that is not collapsing—but is clearly constrained. Executives are operating in a defensive posture, focused…

Large E&P Adds Second Completions Crew and Accelerates 4-Mile Lateral Program

Premium content Large E&P Adds Second Completions Crew and Accelerates 4-Mile Lateral Program

Chord Energy extended its 2025 execution streak in 3Q25, delivering oil volumes above the midpoint of guidance while keeping E&P and other capital spending below the midpoint. The…