Drilling Program - Wells | Drilling Activity
US Energy Preps to Drill New Wells at South TX, Williston Acreage
U.S. Energy Corp. reported that it plans to participate in new wells on its North Dakota and South Texas acreage.
South TX
U.S. Energy will participate in the upcoming Aaron #1 and J.J. #1 wells to be drilled across the Company’s acreage position in both Zavala and Dimmit Counties, Texas (Georgetown formation). U.S. Energy’s working interest in each well is approximately 12.5% and 16.2%, respectively.
Both wells are expected to be drilled during the first quarter of 2019.
This will be U.S. Energy’s third and fourth wells to be drilled in the development program.
Results to date include:
| Well Name | USEG WI% | Initial 24-Hour Rate | 30-Day Rate | 90-Day Rate | |||||
| J.J. #1H | 16.2 | % | – | – | – | ||||
| Aaron #1H | 12.5 | % | – | – | – | ||||
| J. Beeler #1H | 30.0 | % | 1,424 boepd (87% oil) | 820 boepd (85% oil) | – | ||||
| Beeler Ranch #1H | 6.1 | % | 1,227 boepd (85% oil) | 915 boepd (85% oil) | 820 boepd (87% oil) | ||||
Williston Basin
In McKenzie County, North Dakota, U.S. Energy will participate in the drilling of two upcoming wells, the Link 24-12-3H and the Link 24-12HU, on the Company’s existing acreage position.
The expected gross drilling and completion cost of each well is approximately $7.1mm and will be operated by Whiting Petroleum.
U.S. Energy’s working interest in each well is approximately 3.1%.
More Drilling Program - Wells News

Canadan E&P 2026 Program Calls for 448 Net Wells, Up 24% vs. 2025 Plan
Canadian Natural Resources outlined a 2026 operating capital budget of approximately $6.3 billion (total capital budget $6,425 million, including $125 million for carbon capture) targeting 1,590–1,650 MBOE/d of…

Coterra Energy – 2025 Development Summary
Strategic Focus Coterra’s 2025 development program emphasizes: Capital discipline Balanced exposure to oil and gas markets Efficient multi-basin operations High-return well inventory utilization The company plans to maintain…

Appalachia E&P Details 2025, Rig, Wells & Completion Crew Programs
The appalachian operators/E&Ps detailed their 2025 well development plans. Here is a look at 2024, vs 2025.

These Permian Operators Plan to Complete/Frac 2,100 Wells IN 2024
Shale Experts has distilled company presentations, 4Q 2024 capex & development guidance to generate a list of operators and their respective permian basin 2024 development plans. Chevron, said…

Earthstone Energy Talks 2022 Results; Plans Five-Rig Program for 2023
Earthstone Energy, Inc. announced financial and operating results for the quarter and year ended December 31, 2022. 2023 Guidance The Company reaffirms its guidance released on February 16,…
Gulf Coast - South Texas News

Why $90 Oil Isn’t Bringing Back the Rigs
Higher oil prices are not translating cleanly into a drilling response across U.S. shale, and company disclosures are starting to show why. The issue is not simply capital…

Q1 A&D Transactions Jump to $30B , While Deal Flow Was Down 40%
The first quarter of 2026 has officially defined the "Barbell Era" of American oil and gas. While the total number of deals plummeted by 46% YoY (dropping to…

Wright to U.S. Oil Industry: The Price Signal Is Telling You to Drill
Energy Secretary Chris Wright stood in front of the largest gathering of oil executives in the world this morning and delivered a message that was equal parts market…

An Eagle Ford Team That Cashed Out Is Back for Another Cycle
Houston — January 15, 2026 — Lime Rock Partners, a Houston-based private investment firm specializing in upstream oil and gas, has completed an equity commitment to Athena Energy…

Silver Hill Expands South Texas Footprint with Acquisition of 1776 Energy Assets
Silver Hill Energy Partners has acquired 100 percent of 1776 Energy’s South Texas oil and gas assets, significantly expanding its operated footprint across the Eagle Ford and Austin…
Rockies News

This Operator Will Chop it's 2026 Rig Count From 34 to 24
ConocoPhillips is setting up 2026 as a lower-intensity, more efficient operating year — with the clearest proof coming from the Lower 48 activity reset following the Marathon integration.…

A Quiet Capital Pattern Is Forming in North American Upstream — and Almost No One Is Talking About It
A handful of recent transactions and capital raises point to a subtle pattern in North American upstream—one that is easy to miss because each event, on its own,…

Permian E&P Bucking The Trend; Plan to Increasing Drilling & Fracs in 2026
Occidental’s 2025 U.S. onshore program is centered on the Permian, with ~$3.5B of Permian CapEx and ~$0.8B in the Rockies, totaling ~$4.3B. This supports ~15 net rigs in…

Bakken Midstream Project shelved; as future growth projects thin
Hess Midstream highlighted continued throughput growth across its Williston Basin (Bakken/Three Forks) systems, signaling higher utilization in gas gathering and processing. For producers, the only forward-looking capacity signal…

Japex Enters DJ Basin with Acquistion of Verdad
Japan Petroleum Exploration Co., Ltd. (JAPEX) has announced a major expansion into North American shale with a $1.3 billion acquisition of Verdad Resources Intermediate Holdings LLC (VRIH), marking…