Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Top Story | Capital Markets | Capital Expenditure

WPX Talks 2014 Spending; Hones In on Williston, Piceance Basins

printPrint    |   
WPX Talks 2014 Spending; Hones In on Williston, Piceance Basins

WPX Energy has reported a 2014 capital plan of $1.47 billion (midpoint), with approximately 85 percent of spending allocated to Williston, Piceance and San Juan Gallup development.

2014 Highlights: 39 percent planned increase in domestic oil volumes 62 Williston Basin oil wells (gross) planned – an increase of 25 percent vs. 2013 29 San Juan Gallup oil wells planned – nearly doubling 2013 activity Recent transactions increase Gallup oil acreage by 40 percent to 43,000 acres 285 natural gas wells (gross) planned in the Piceance, including up to 10 Niobrara wells 6 percent expected exit rate growth in the Piceance vs. 2013 exit rate

WPX expects these investments to drive an estimated 2014 December exit rate of 1,310 MMcfe/d in total production, which is 5 percent higher than its 2013 exit…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Rockies News


Williston Basin News

Permian E&P Bucking The Trend; Plan to Increasing Drilling & Fracs in 2026

Premium content Permian E&P Bucking The Trend; Plan to Increasing Drilling & Fracs in 2026

Occidental’s 2025 U.S. onshore program is centered on the Permian, with ~$3.5B of Permian CapEx and ~$0.8B in the Rockies, totaling ~$4.3B. This supports ~15 net rigs in…

Bakken Midstream Project shelved; as future growth projects thin

Premium content Bakken Midstream Project shelved; as future growth projects thin

Hess Midstream highlighted continued throughput growth across its Williston Basin (Bakken/Three Forks) systems, signaling higher utilization in gas gathering and processing. For producers, the only forward-looking capacity signal…

Japex Enters DJ Basin with Acquistion of Verdad

Japex Enters DJ Basin with Acquistion of Verdad

Japan Petroleum Exploration Co., Ltd. (JAPEX) has announced a major expansion into North American shale with a $1.3 billion acquisition of Verdad Resources Intermediate Holdings LLC (VRIH), marking…

Dallas Fed Energy Survey: What Oil and Gas Executives Are Really Saying

Dallas Fed Energy Survey: What Oil and Gas Executives Are Really Saying

The latest Dallas Fed Energy Survey shows a U.S. oil and gas industry that is not collapsing—but is clearly constrained. Executives are operating in a defensive posture, focused…

Large E&P Adds Second Completions Crew and Accelerates 4-Mile Lateral Program

Premium content Large E&P Adds Second Completions Crew and Accelerates 4-Mile Lateral Program

Chord Energy extended its 2025 execution streak in 3Q25, delivering oil volumes above the midpoint of guidance while keeping E&P and other capital spending below the midpoint. The…