Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Well Cost | Well Lateral Length | Quarterly / Earnings Reports | Second Quarter (2Q) Update | Production Rates | Initial Production Rates | Forecast - Production | Capital Markets | Capex Increase | Drilling Program-Rig Count

SandRidge Ramps Up Capex 20% ; Focus on STACK & Mississippian

printPrint    |   
SandRidge Ramps Up Capex 20% ; Focus on STACK & Mississippian

[Summary: [Summary: SandRidge reported its Q2 results where it focused on production from its assets and its revived guidances.

Highlights Include: The company raised its production guidance from 14 - 14.7 mmboe to 14.2 - 14.9 mmboe, with oil comprising half of the increase Q2 capex was $57 million - SandRidge is increasing its capex from $210-220 million to $250-260 million, an increase of about 18.6% However, D&C capex will be reduced by about $10 million Reduced Mid-Con D&C by $5 million while increasing laterals drilled in the area from 22 to 34 Drilled its first Major County, Meramec well with a two mile lateral, which hit a 30 day IP of 902 boe/d (81% oil)

The company is currently running 3.5 rigs (2.5 in the Meramec and 1 in North Park). As a result of the outperformance of…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More Second Quarter (2Q) Update News

Mid-Continent News


Rockies News

Permian E&P Bucking The Trend; Plan to Increasing Drilling & Fracs in 2026

Premium content Permian E&P Bucking The Trend; Plan to Increasing Drilling & Fracs in 2026

Occidental’s 2025 U.S. onshore program is centered on the Permian, with ~$3.5B of Permian CapEx and ~$0.8B in the Rockies, totaling ~$4.3B. This supports ~15 net rigs in…

Bakken Midstream Project shelved; as future growth projects thin

Premium content Bakken Midstream Project shelved; as future growth projects thin

Hess Midstream highlighted continued throughput growth across its Williston Basin (Bakken/Three Forks) systems, signaling higher utilization in gas gathering and processing. For producers, the only forward-looking capacity signal…

Japex Enters DJ Basin with Acquistion of Verdad

Japex Enters DJ Basin with Acquistion of Verdad

Japan Petroleum Exploration Co., Ltd. (JAPEX) has announced a major expansion into North American shale with a $1.3 billion acquisition of Verdad Resources Intermediate Holdings LLC (VRIH), marking…

Dallas Fed Energy Survey: What Oil and Gas Executives Are Really Saying

Dallas Fed Energy Survey: What Oil and Gas Executives Are Really Saying

The latest Dallas Fed Energy Survey shows a U.S. oil and gas industry that is not collapsing—but is clearly constrained. Executives are operating in a defensive posture, focused…

Large E&P Adds Second Completions Crew and Accelerates 4-Mile Lateral Program

Premium content Large E&P Adds Second Completions Crew and Accelerates 4-Mile Lateral Program

Chord Energy extended its 2025 execution streak in 3Q25, delivering oil volumes above the midpoint of guidance while keeping E&P and other capital spending below the midpoint. The…