Exploration & Production | Drilling & Completions | Well Cost | Well Lateral Length | Top Story
Jones Moves Cleveland From Gas to Oil with Cemented Sleeves
Full Disclosure: NCS Frac is an advertiser with Shale Experts. No consideration or payment was made in the creation of this article.
Jones Energy has been seeing transformational results from switching to cemented liner frac jobs in the Cleveland Tonkawa play in the Anadarko Basin.
Highlights:
- Switching to Cemented Sleeves; Tighter Spacing, More Stages, Greater Frac Density
- Moving Cleveland Tonkawa to an Oil Play
- $4.3 MM Well Cost
- 12 Stages per Day
- Increased Frac Density Increasing Oil Production; Gas Unaffected
- Greater Cumulative Production and Slower Decline for Oil
Enlarge Image
Enlarge Image
Enlarge Image
Enlarge Image
Enlarge Image
Enlarge Image