Northern Blizzard Resources Inc. has announced its operating and financial results for the three and six months ended June 30, 2015.
Operations
Cactus Lake
- Capital expenditures at Cactus Lake for the second quarter of 2015 were $8.0 million, mainly related to the Bakken polymer flood. Average production in the second quarter was 7,525 boe/d, a 5% decrease compared to the first quarter of 2015.
Cactus Lake Bakken Polymer Flood
- Phases 1 and 2 of the Bakken polymer flood continue to demonstrate positive response. Over 30% of the producers in Phase 1 are demonstrating positive polymer flood response (i.e. increasing oil rates and decreasing water cuts). Polymer injection commenced at Phase 1 in early 2013. In addition, over 20% of the producers in Phase 2 are responding to the polymer flood initiated in early 2014.
- Phase 3 expansion of the Bakken polymer flood commenced in March 2015 with the inclusion of 16 injectors and 36 producing wells into the existing scheme. The Phase 3 expansion is anticipated to be completed in early 2016, adding an additional 48 producing wells and 14 injectors.
Winter
- Capital expenditures at Winter for the second quarter of 2015 were $0.7 million . Average production in the second quarter was 3,550 boe/d.
- In the second half of 2015, Northern Blizzard is planning to drill seven producers and three water disposal wells at Winter. Work is currently underway to further optimize the water disposal system in preparation of the anticipated increase in volumes.
Coleville
- Capital expenditures at the Coleville Viking light oil project for the second quarter of 2015 were $0.4 million. Average production in the second quarter was 1,270 boe/d, a 23% decrease compared to the first quarter of 2015.
- The 2015 capital program at Coleville includes the drilling of 21 wells, of which 3 (3.0 net) wells were drilled in the first quarter of 2015. The remaining wells are scheduled to be drilled in the second half of 2015.
Thermal Heavy Oil – Steam Assisted Gravity Drainage (SAGD)
- Plover Lake SAGD production averaged 1,090 boe/d during the second quarter of 2015, compared to 760 boe/d during the first quarter of 2015. Ramp up of oil production has continued since quarter end, with July production averaging 1,440 boe/d. Production is expected to exceed 2,000 boe/d later in 2015. Northern Blizzard acquired two additional 25 mmBTU steam generators and is currently evaluating plans to deploy these units to expand the Plover Lake steam generating capacity from 6,000 to 9,000 barrels of steam per day.
- At Cactus Lake North, Northern Blizzard received regulatory approval to proceed with the first phase of the SAGD project. The Company is currently working on preliminary design and development planning for this SAGD project area.
Second Quarter 2015
- Capital expenditures for the second quarter of 2015 totalled $14.4 million. Spending on facilities and pipelines was $9.9 million and related mainly to polymer powder for the Cactus Lake polymer project and advancing the Cactus Lake SAGD project.
- Net debt at June 30, 2015 of $366.5 million decreased by 10% from the end of the first quarter of 2015. The decrease was due to funds from operations that exceeded capital expenditures and cash dividends by $36.5 million and an unrealized foreign exchange gain on Northern Blizzard's senior unsecured notes caused by a stronger Canadian dollar on June 30, 2015 relative to March 31, 2015.
- Second quarter 2015 production was 21,598 boe/d (96% oil). Production was 22,031 boe/d for the first six months of 2015, an 11% increase compared to the first half of 2014. Annual 2015 guidance of 21,600 boe/d remains unchanged.
- Operating costs for the second quarter of 2015 were $17.41 per boe. Operating costs were $16.80 per boe for the first six months of 2015, a 20% decrease compared to the first half of 2014. The Company benefited from cost saving measures implemented across all operating areas that reduced downhole and surface maintenance costs.
- Northern Blizzard has a comprehensive hedging program in place to protect prices on crude oil volumes and maintain the stability of cash flows. We have WTI hedges in place for 0.9 million barrels (5,000 bbl/d) for the second half of 2015 at an average price of C$91.36 /bbl, 4.2 million barrels (11,500 bbl/d) in 2016 at an average price of C$79.50 /bbl and 0.7 million barrels (2,000 bbl/d) in 2017 at an average price of C$83.11 /bbl.
- Cactus Lake: Production from this area averaged 7,525 boe/d for the quarter supported by positive response from the Bakken polymer flood. An additional 60 drilling locations were recently identified by new 3D seismic, bringing the total to over 300 drilling locations.
- Winter: Production in the second quarter averaged 3,550 boe/d (100% oil). Production from this area continues to grow at a compounded annual growth rate of over 20% supported by over 400 drilling locations and excellent capital efficiencies.
- Coleville : Production in the second quarter averaged 1,270 boe/d. We have undeveloped lands with over 300 drilling locations and expect to grow production in this area to over 2,500 boe/d within the next two years.
- Plover Lake SAGD: Production from this area averaged 1,090 boe/d (100% oil) in the second quarter. Ramp up of production has continued since quarter end with July oil production averaging 1,440 boe/d.
Canada News

Western Canada Upstream M&A: Q1 2026 Transaction Report
Western Canadian M&A activity in Q1 2026 was characterized by a 87% decrease in total deal value compared to Q1 2025, totaling $0.8 billion C$. However, transaction volume…

Canadan E&P 2026 Program Calls for 448 Net Wells, Up 24% vs. 2025 Plan
Canadian Natural Resources outlined a 2026 operating capital budget of approximately $6.3 billion (total capital budget $6,425 million, including $125 million for carbon capture) targeting 1,590–1,650 MBOE/d of…

EIA’s “Glut” Calls: The 2025 Surplus Claim — and How 2021–2024 Forecasts Actually Held Up
The “~2.2 MMb/d glut in 2025” framing traces to the EIA’s Short-Term Energy Outlook (STEO), December 2025. EIA doesn’t usually write “glut” in the tables—what they publish is…

Whitecap Details 2026 Duvernay & Montney Program
Whitecap Resources reported strong third quarter 2025 operating and financial results, marking its first full quarter following the strategic combination with Veren that closed on May 12, 2025.…

ARC Resources: Lower 2026 Capex, Higher Volumes
ARC Resources used its third quarter update to reinforce a familiar message to Canadian E&P executives: disciplined capital, structurally better market access, and a growing shareholder return program…
North America News

Baytex 2026 Development Plans
Baytex’s 2026 development plan reflects a post–Eagle Ford sale capital program and a sharpened focus on its core Canadian assets. The Company approved 2026 exploration and development expenditures…

Tourmaline: 2026 Capital Program Locked In at $2.9B
Tourmaline’s 2026 exploration and production (EP) program is set at $2.9 billion and targets average production of 690,000–710,000 boepd, with the company maintaining the multi-year EP Plan released…

Cenovus Outlines 2026 Development Plan Following MEG Integration
Cenovus’ 2026 plan targets capital investment of $5.0 billion to $5.3 billion (including ~$350 million of capitalized turnaround costs) and upstream production of 945,000 BOE/d to 985,000 BOE/d,…

Gran Tierra Energy To Step Down Activity in 2026
Gran Tierra Energy’s 2026 development plan reflects a step-down in spending and activity as the company transitions from fulfilling Ecuador exploration commitments in 2025 toward a free-cash-flow-focused program.…

Advantage Plans $300–$330MM 2026 Capital Program
Advantage’s 2026 development plan centers on Glacier-focused drilling and key midstream work. The company plans total capital spending of $300 million to $330 million and expects production to…