Skip to main content

Operator · Montney Shale

Delphi Energy Corp.

41 articles mentioning Delphi Energy Corp. · Page 2 of 3

Delphi Details Bigstone Montney Reserve Report

Delphi Details Bigstone Montney Reserve Report

Delphi Energy Corp. reported its crude oil and natural gas reserves information for the year ended December 31, 2015.

Delphi Touts 2015 Ops; Cuts Montney Well Costs to $6.5MM

Delphi Touts 2015 Ops; Cuts Montney Well Costs to $6.5MM

The company also reduced net debt by 33 percent to an expected $122 -124 million at the end of the year.

Delphi Drilling 8 Montney Wells Through Q4 2016

Delphi Drilling 8 Montney Wells Through Q4 2016

Projecting it can drill and place on production up to eight Montney wells between now and the end of 2016.

Delphi Seeing Up to 50% Higher IP 24's with Slickwater Fracs

Delphi Seeing Up to 50% Higher IP 24's with Slickwater Fracs

First well completed with a redesigned slickwater frac program over 37 stages.

Delphi Energy's New Montney Fracs Give Faster Payout

Delphi Energy's New Montney Fracs Give Faster Payout

The Company has 15 wells which have been drilled with an average horizontal length of 2,500 to 3,000 metres and fracked with 30 to 40 stages utilizing the Company's slickwater hybrid frac technique.

Delphi Scales Back 2015 Operations

Delphi Scales Back 2015 Operations

Reducing Montney hz wells from eight to six, capital is 21% lower than previous guidance.

Delphi Energy Completes 8 Slickwater Montney Wells in 2014

Delphi Energy Completes 8 Slickwater Montney Wells in 2014

Delphi has now commenced drilling operations at its eighth Montney well of 2014.

Delphi Sees Results From Slickwater Frac in Montney

Delphi Sees Results From Slickwater Frac in Montney

slickwater hybrid fracturing technique has significant impact in comparison to smaller conventional frac methods.

Delphi Moves Montney to Slickwater, Sees Greater Production

Delphi Moves Montney to Slickwater, Sees Greater Production

Delphi Energy transitioned to slickwater hybrid fracs in the Montney and is seeing greatly improved results.

Delphi Tests HZ Montney Well After 30-Stage Slickwater Frac

Delphi Tests HZ Montney Well After 30-Stage Slickwater Frac

The Company is pleased to report it has achieved its first quarter of 2014 corporate production target of 10,000 boe/d.

Delphi Exceeds Previous Record with Bumper Well

Delphi Exceeds Previous Record with Bumper Well

The 15-21 Montney well was drilled to a total depth of 5,875 metres with a horizontal lateral length of 2,886 metres and stimulated witha 30 stage slickwater hybrid completion.

Delphi Energy Completes Record Montney Well

Delphi Energy Completes Record Montney Well

Delphi’s 100 percent working interest 15-30-60-23W5M Montney well was drilled to a total depth of 5,834 metres with a Company record horizontal lateral length of 3,014 metres. The well produced, over the final 24 hours, at...

Delphi: Optimized Drilling Techniques Bolstering Montney Results

Delphi: Optimized Drilling Techniques Bolstering Montney Results

Delphi Energy Corp. has reported its latest Bigstone Montney well results and has attributed its success to its recent optimization of its drilling and completion techniques.

Delphi Touts East Bigstone Montney Well Results

Delphi Touts East Bigstone Montney Well Results

The capital program is expected to be a continuous one rig drilling program with up to eight additional wells planned for 2014.

Delphi Touts Over 50% Upswing in Bigstone Montney Reserves

Delphi Touts Over 50% Upswing in Bigstone Montney Reserves

Additionally, Delphi increased total proved plus probable Bigstone Montney reserves by 143% to 26.8 MMBOE compared to 11.0 MMBOE at year-end 2012.

Delphi Ramps Up Montney Reserve Potential; Details Wells

Delphi Ramps Up Montney Reserve Potential; Details Wells

The company increased total proved plus probable Bigstone Montney reserves by 233 percent to 11.0 million boe compared to 3.3 million boe in 2011.

Delphi Preps for Completion Ops at Bigstone Montney Well

Delphi Preps for Completion Ops at Bigstone Montney Well

Completion operations consisting of a multi-stage slick-water hybrid frac program is expected to commence early in January. The drilling rig is expected to move to its next location and commence drilling after the Christmas break.

Delphi Energy Sells Cardium Oil Assets; Update Montney Drilling Activities

0

Delphi Energy Provides Third Montney Well Update

0

Delphi Energy Commences Production at East Montney Project

0