Permitting Activity
July 21,2025 : Green Century Exploration LLC Permitted the SYNDICATE FEE A 5A Vertical well in Crane,TX : Central Basin,Permian BasinJune 18,2025 : Green Century Exploration LLC Permitted the SYNDICATE FEE A 5 Vertical well in Crane,TX : Central Basin,Permian BasinNovember 12,2024 : Green Century Exploration LLC Permitted the SHANNON ESTATE NOELKE SE S 37 Vertical well in Crockett,TX : Midland BasinMarch 27,2023 : Green Century Exploration LLC Permitted the M.L. BARNSLEY ``B`` P 1 Vertical well in Crane,TX : Central Basin,Permian BasinNovember 07,2022 : Green Century Exploration LLC Permitted the SECTION 21 LEASE S 45A Vertical well in Crockett,TX : Midland Basin Click here for More Permits ActivityCompletion Activity / Well Results
June 09,2021 : Green Century Exploration LLC completed the TUCKER, NELLIE M. 9 well in Crane,TX with 0 Million lbs of proppant using Hybrid Frac. The Well flowed 44 boe/d which consists of 39 Oil BOPD and 31 Mcf of gas .December 02,2020 : Green Century Exploration LLC completed the TUCKER, NELLIE M. C 2 well in Crane,TX . The Well flowed 61 boe/d which consists of 44 Oil BOPD and 0.096 MMcf of gas .October 13,2017 : Green Century Exploration LLC completed the SHANNON ESTATE NOELKE SE S 1 A well in Crockett,TX with 0 Million lbs of proppant using Cross Linked Frac. The Well flowed 27 boe/d which consists of 27 Oil BOPD .February 28,2017 : Green Century Exploration LLC completed the SHANNON ESTATE NOELKE SE S 17 well in Crockett,TX with 0 Million lbs of proppant using Hybrid Frac. The Well flowed 1 boe/d which consists of 1 Oil BOPD .October 18,2016 : Green Century Exploration LLC completed the SHANNON ESTATE NOELKE SE S 26 well in Crockett,TX with 0 Million lbs of proppant using Cross Linked Frac. The Well flowed 1 boe/d which consists of 1 Oil BOPD . Click here for More Completion ActivityAbout
Green Century Exploration & Production, LLC, the operating subsidiary of Green Century Resources, continues to develop a shallow waterflood project in West Texas. Phase I of the project had a was comprised of 21 new vertical infill wells strategically located on approximately 15 acre spacing to revitalize the leased field. We have now establish secondary recovery (“waterflood”) operations throughout the vast majority of the field. Historically, the field yielded solid primary production, but overall primary recovery was low. The old wells in the project area have been plugged, with only a small pilot flood undertaken in the past.
Green Century Exploration & Production, has fully funded its Phase I drilling and development plan with the help of a small number of non-op industry participants. Total capital requirements were budgeted at $10 million, and we have brought in the project under budget. This group continues to fund expansion.
Suite 402
Midland TX 79701
Basin |
---|
CENTRAL BASIN PLATFORM |
MIDLAND BASIN |
A valid subscription is required to view this information
Please sign in to see the details - Sign In Need a Subscription?Click Here to Subscribe
A valid subscription is required to view this information
Please sign in to see the details - Sign In Need a Subscription?Click Here to Subscribe
A valid subscription is required to view this information
Please sign in to see the details - Sign In Need a Subscription?Click Here to Subscribe