Skip to main content

Midstream

Tellurian Inc.

Permits filed by quarter

Drilling-permit volume since 2020

28 permits on file · Showing page 2 of 2

Permit date Well Operator Field / zone County State Bore
Nov 10, 2021 HA RB SU90;NRG 29-12-10 H AETHON ENERGY OPERATING LLC RED RIVER-BULL BAYOU RED RIVER LA Horizontal
May 20, 2021 HA RA SUA;RAMBIN 12-11-11 H ADAMAS ENERGY LLC DE SOTO LA Horizontal
May 17, 2021 HA RA SUA;RAMBIN 12-1-11-11 HC ADAMAS ENERGY LLC DE SOTO LA Horizontal
Dec 15, 2020 HA RB SU90;BYU PIERRE29-12-10H AETHON ENERGY OPERATING LLC RED RIVER-BULL BAYOU RED RIVER LA Horizontal
Dec 15, 2020 HA RB SU90;BYU PIERRE29-12-10H AETHON ENERGY OPERATING LLC RED RIVER-BULL BAYOU RED RIVER LA Horizontal
Oct 25, 2018 HA RA SUA;RAMBIN 12&01-11-11HC ADAMAS ENERGY LLC CHEMARD LAKE / NOT REPORTED Test DE SOTO LA new (horizontal well)
Oct 25, 2018 HA RA SUA;RAMBIN 12&01-11-11HC ADAMAS ENERGY LLC CHEMARD LAKE / NOT REPORTED Test DE SOTO LA new (horizontal well)
Aug 13, 2018 HA RB SU90;NRG 29-12-10 H AETHON ENERGY OPERATING LLC RED RIVER-BULL BAYOU / NOT REPORTED Test RED RIVER LA new (horizontal well)
Download GIS parcel & property records for Red River Parish, LA →
Parcel boundaries, ownership and acreage from Dynamo Spatial