Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Well Lateral Length | Proppant

Pedevco Ups Proppant Concentration at Latest Niobrara Wells

printPrint    |   
Pedevco Ups Proppant Concentration at Latest Niobrara Wells

PEDEVCO Corp., d/b/a Pacific Energy Development, has successfully completed the drilling of the Loomis 2-3H well and has spud the third well, the Loomis 2-6H.

Both wells are located on the Company's Wattenberg Asset in Colorado, and are the second and third wells of a three well-pad drilling program that began in August 2014. The drilling of the first well, the Loomis 2-1H, was completed earlier this month. 

The Loomis 2-3H well reached a total measured depth of 11,345 feet, with a 6,279 foot total vertical depth and 4,227 foot completed lateral length through the Niobrara "B" Bench, with Niobrara "B" Bench chalk present across the entire well bore with a thickness of approximately 45 feet, and drill cuttings from the well bore evidencing highly prolific oil rich shale reservoir…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


Rockies News