Skip to main content

Latest News and Analysis
Deals and Transactions
Track Drilling (Rigs by operator) | Completions (Frac Spreads)

Exploration & Production | Drilling & Completions | Well Cost | Well Lateral Length | Top Story | Production

Pedevco Looks to Exceed Average IP at Niobrara Loomis Pad

printPrint    |   
Pedevco Looks to Exceed Average IP at Niobrara Loomis Pad

PEDEVCO Corp. d/b/a Pacific Energy Development has commenced testing to determine the initial production rates of the Company's 3 new horizontal Loomis wells recently drilled and completed on a 3-well pad in Weld County, Colorado.

Since completion, the three Loomis wells -- the Loomis 2-1H, Loomis 2-3H and Loomis 2-6H -- have been on flow-back. With recent sub-zero temperatures in Eastern Colorado, the flow-back was temporarily reduced or halted at times. Through the use of heaters coupled with higher outside temperatures, the Company has now resumed flow-back and is commencing initial production rate testing of these wells.

Based on the initial flow-back, the Company anticipates these wells will exceed the average initial production rates of all prior horizontal wells drilled and…

Finish this article — free account or subscription
  • ✓  Full news archive — U.S., Canada & international coverage
  • ✓  A&D transactions — asset deals, corporate M&A, assets for sale
  • ✓  Permits & completions data, plus 900,000+ slides & presentations
No credit card. Includes 15 days of full access to permits, deals, completions and presentations.
Already a subscriber? Log in


More Drilling & Completions News

Rockies News