-
Chesapeake Energy Corp ( NYSE: CHK )
Area | Category | 2023 | 2024 Est. Initial | Updated 2024 Guidance | %Difference (2023 vs 2024) |
Company Wide | Total Capital Expenditure ($mm) |
Permitting Activity
January 30,2024 : Chesapeake Energy Corp Permitted the HA RA SUI;WALC 8&5-12-9HC 002-ALT Horizontal well in Red River,LA : Haynesville ShaleJanuary 30,2024 : Chesapeake Energy Corp Permitted the HA RA SUI;WALC 8&17-12-9HC 001-ALT Horizontal well in Red River,LA : Haynesville ShaleJanuary 30,2024 : Chesapeake Energy Corp Permitted the HA RA SUI;WALC 8&5-12-9HC 001-ALT Horizontal well in Red River,LA : Haynesville ShaleDecember 05,2023 : Chesapeake Energy Corp Permitted the WANSLEY 25-12-13 1 Vertical well in De Soto,LA : December 05,2023 : Chesapeake Energy Corp Permitted the HA RA SUR;BETHARD 7&18-12-9HC 004-ALT Horizontal well in Red River,LA : Haynesville Shale Click here for More Permits ActivityCompletion Activity / Well Results
November 04,2021 : Chesapeake Energy Corp completed the PGE DOS Z 4H well in Webb,TX. The Well flowed 4.05 MMcf of gas on a 15,527 foot lateral .October 25,2021 : Chesapeake Energy Corp completed the PGE DOS Z 3H well in Webb,TX. The Well flowed 4.497 MMcf of gas on a 15,684 foot lateral .September 30,2021 : Chesapeake Energy Corp completed the PGE DOS Z 2H well in Webb,TX. The Well flowed 4,164 Mcf of gas on a 9,381 foot lateral .June 24,2021 : Chesapeake Energy Corp completed the BELL D 1H well in Burleson,TX with 24 Million lbs of proppant using Slick Water Frac. The Well flowed 762 boe/d which consists of 703 Oil BOPD and 345 Mcf of gas on a 6,607 foot lateral .June 24,2021 : Chesapeake Energy Corp completed the BROWN RFI B 1 1H well in Burleson,TX using Slick Water Frac. The Well flowed 71 boe/d which consists of 57 Oil BOPD and 0.081 MMcf of gas on a 6,899 foot lateral . Click here for More Completion ActivityLatest News & Activity
-
Chesapeake To Acquire Southwestern EnergyJanuary 11,2024
-
Silverbow Increase Eagleford Footprint , Chesapeake ExitsAugust 14,2023
-
Chesapeake Energy Corporation First Quarter 2023 ResultsMay 04,2023
-
Subscribe To See
February 21,2023
-
Chesapeake Energy Q4, Full Year 2022 ResultsFebruary 21,2023
-
Wildfire Acquired More Eagle Ford Assets For $1.42 Billion From ChesapeakeJanuary 18,2023
-
Chesapeake Energy Third Quarter 2022 ResultsNovember 01,2022
-
Chesapeake Engages Evercore to Market Eagle Ford PortfolioAugust 24,2022
-
Subscribe To See
August 03,2022
Deals - Chesapeake Energy Corp Acquisitions
Announce Date | Price($MM) | Region/Basin | Headline | |
---|---|---|---|---|
Jan-11-2024 | Northeast - Appalachia,Ark-La-Tex | Chesapeake To Acquire Southwestern Energy | ||
Jan-25-2022 | Northeast - Appalachia | Chesapeake Acquires Marcellus-Focused Chief E&D Holdings for $2.6B | ||
Aug-11-2021 | Ark-La-Tex | Chesapeake to Acquire Vine Energy in Deal Worth $2.2 Billion | ||
Total |
Deals - Chesapeake Energy Corp Divestiture(s)
Announce Date | Price($MM) | Region/Basin | Headline | |
---|---|---|---|---|
Aug-14-2023 | Gulf Coast | Silverbow Increase Eagleford Footprint , Chesapeake Exits | ||
Feb-21-2023 | Gulf Coast | Subscribe To See | ||
Jan-18-2023 | Wildfire Acquired More Eagle Ford Assets For $1.42 Billion From Chesapeake | |||
Total |
Capital Raised
Announced Date | Amount($MM) | Type | Headline | |
---|---|---|---|---|
Sep-26-2018 | Debt | Chesapeake Launches $1.25B Public Debt Offering at 7 Percent | ||
May-24-2017 | Debt | Chesapeake Priced $750 Million Senior Notes at 8% | ||
Dec-06-2016 | Debt | Chesapeake Upsizes Debt Offering to $1.0 Billion | ||
Total |
About
Chesapeake Energy Corporation engages in the acquisition, exploration, development, and production of natural gas and oil properties in the United States The company also offers marketing, midstream, drilling, and other oilfield services Chesapeake Energy Corporation was founded in 1989 and is based in Oklahoma City, Oklahoma
6100 North Western Avenue
Oklahoma TX 73118
Oklahoma TX 73118
Phone Number
405 848 8000
Latest Presentations More Presentations>>
Key Slides found in this Presentation
Drilling Activity (
Jan 2017 - Apr 2024)
Basin |
---|
ANADARKO BASIN |
APPALACHIAN BASIN |
ARKLATEX BASIN |
FORT WORTH BASIN |
GULF COAST BASIN |
POWDER RIVER |
POWDER RIVER BASIN |
Personnel (39 people)
-
-
-
-
Manager - Sales Adminstration
- Phone : -
Manager - Sales Adminstration
- Phone : -
-
Geological Manager Sahara/Nemaha
- Phone : -
Geological Manager Sahara/Nemaha
- Phone : -
-
Land Manager - Arkoma
- Phone : -
Land Manager - Arkoma
- Phone : -
-
- Phone : -
- Phone : -
-
Vice President-Revenue /Midstream Accounting
- Phone : -
Vice President-Revenue /Midstream Accounting
- Phone : -
-
Districk Manager - Andarko
- Phone : -
Districk Manager - Andarko
- Phone : -
-
- Phone : -
- Phone : -
-
VIce President-Land Administration
- Phone : -
VIce President-Land Administration
- Phone : -
-
-
-
Frist Name | Last Name | Title | Phone | |
---|---|---|---|---|
Arthur | Zwierlein | arthur.zwierlein@chk.com | ||
Bill | Wince | Manager - Sales Adminstration | bill.wince@chk.com | 405-935-4210 |
Bob | Campbell | Geological Manager Sahara/Nemaha | bob.campbell@chk.com | 405-935-2629 |
Bob | Portman | Land Manager - Arkoma | bob.portman@chk.com | 405-935-7910 |
Brett | Finley | brett.finley@chk.com | 405-935-6216 | |
Dale | Cook | Vice President-Revenue /Midstream Accounting | dale.cook@chk.com | 405-835-9254 |
Darvin | Knapp | Districk Manager - Andarko | darvin.knapp@chk.com | 405-935-9426 |
Dave | Johns | dave.johns@chk.com | 817-502-4611 | |
David | Mobley | VIce President-Land Administration | david.mobley@chk.com | 405-935-9362 |
Doug | Nix | doug.nix@chk.com | ||
Douglas | Jacobson | Executive Vice President | doug.jacobson@chk.com | 405-935-6273 |
Gary | Dunlap | Land Manager-LA/TX/NM/Rockies/CBM | gary.dunlap@chk.com | 405-935-9285 |
Gordon | Pennoyer | Senior Director Strategic Communications | gordon.pennoyer@chk.com | |
Grant | Raney | Associate Landman | grant.raney@chk.com | 405-658-9222 |
Greg | Small | greg.small@chk.com | 405-935-9372 | |
Henry J | Hood | VP - Land & Legal | henry.hood@chk.com | 405-935-8000 |
James | Roller | james.roller@chk.com | 405-935-8252 | |
Jim | Johnson | jim.johnson@chk.com | 405-935-9163 | |
John | Kapchinske | Geological Manager-Andarko | john.kapchinske@chk.com | 405-935-2798 |
Kelly | Edson | Associate Landman | kelly.edson@chk.com | 405-935-6273 |
Kevin | McCotter | Vice President Corporate Development | kevin.mccotter@chk.com | 318-674-7217 |
Lanny | Holman | Geoscience Coordinator-Andarko District | lanny.holman@chk.com | 405-935-7980 |
Larry | Lunardi | Chief Geologist | larry.lunardi@chk.com | 405-935-9280 |
Linda | Good | Senior Reglatory Compliance Specialist | linda.good@chk.com | 405-935-4275 |
Marc | Rowland | CFO / VP Finance | marc.rowland@chk.com | 405-935-9232 |
Mark | Edge | Manager - Gas Sales | mark.edge@chk.com | 405-935-9239 |
Matt | Sheppard | Senior Director | matt.sheppard@chk.com | 405-935-9257 |
Michael | Johnson | Controller/SVP-Accounting | mike.johnson@chk.com | 405-935-9229 |
Michael S | Sawatzky | Vice President - Acquisitions | mike.sawatzky@chk.com | 405-935-7875 |
Pat | Rolla | Geological Manager- A&D & Southern Mid-Continent | pat.rolla@chk.com | 405-935-9278 |
Paul | Hagemeier | paul.hagemeier@chk.com | 905-935-4014 | |
Randy | Goben | Assistant Controller-Operations | randy.goben@chk.com | 405-935-9156 |
Richard | Easterly | Marketing Manager | richard.easterly@chk.com | 405-935-2605 |
Ronnie W | Ward | Land Manager-Northeaser OK & KS | ronnie.ward@chk.com | 405-935-9411 |
Scott | Rotruck | Vice President Corporate Development | scott.rotruck@chk.com | 304-284-9674 |
Steve | Miller | VP Operations | steve.miller@chk.com | 405-935-8000 |
Steven C | Dixon | Senior VP - Operations | steve.dixon@chk.com | 405-935-8000 |
Taylor | Shinn | Senior Director Corporate Development | taylor.shinn@chk.com | 405-935-1752 |
Ty | Burnett | ty.burnett@chk.com | 406-641-4624 |
A valid subscription is required to view this information
Please sign in to see the details - Sign In Need a Subscription?Click Here to Subscribe
A valid subscription is required to view this information
Please sign in to see the details - Sign In Need a Subscription?Click Here to Subscribe
A valid subscription is required to view this information
Please sign in to see the details - Sign In Need a Subscription?Click Here to Subscribe
Area | Category | 2023 | 2024 Est. Initial | Updated 2024 Guidance | %Difference (2023 vs 2024) |
Company Wide | Total Capital Expenditure ($mm) |
Chesapeake Energy Q4, Full Year 2022 Results; IDs $1.8B 2023 Capex
February 21,2023
Chesapeake Energy Third Quarter 2022 Results
November 01,2022
Chesapeake Engages Evercore to Market Eagle Ford Portfolio
August 24,2022
- Subscribe To See
August 03,2022
Company Divestiture
Announce Date | Buyer | $MM | Type | Play/Location | Details |
---|---|---|---|---|---|
Aug-14-2023 | Asset | Eagle Ford Shale | |||
Feb-21-2023 | Asset | Eagle Ford Shale | |||
Jan-18-2023 | Asset | Eagle Ford Shale |
Company Acquisitions
Announce Date | Seller | $MM | Type | Play/Location | Details |
---|---|---|---|---|---|
Jan-11-2024 | Corporate | Marcellus Shale,Utica Shale | |||
Jan-25-2022 | Corporate | Marcellus Shale | |||
Aug-11-2021 | Corporate | Haynesville Shale,Bossier |
No Results found
Company Indentifies an Inventory of 4,600 Refracs
June 25,2015
Chesapeake has 4600 under-stimulated legacy wells.
What to Expect in the Second Half of 2015 - Top Three US Drillers
May 26,2015
Looked at three of the top drillers in the US.
Chesapeake to Chop Eagle Ford Rig Count in Half; Downspacing Tests
May 10,2015
Buried in Q1 2015 earnings call, Chesapeake Energy talked about its plan for the Eagle Ford the second half of the year.
Chk 1Q: Eagle Ford, East TX, MissLime, Marcellus, Utica, Niobrara
May 06,2015
Chesapeake Energy Corp. has reported a first quarter 2015 update on its operations, including completion design, strategies, well results and more.
Chesapeake Ups Guidance for 2015; Talks 1Q Results
May 06,2015
Average production of approximately 686,000 boe per day, an increase of 14% year over year, adjusted for asset sales.
Howard Weil Keynotes: Rig Plans in 2015
March 24,2015
Rig counts for 2015 are loaded at the front with many companies deferring completions until H2 2015.
Chesapeake Chops Budget by $500 MM
March 23,2015
Reduced its 2015 capital budget to $3.5 – $4.0 billion for 2015.
Operators Delaying Completions to Combat Oil Slump
February 27,2015
As plans for 2015 roll out, a new strategy to weather the $50/barrel storm is emerging. Many operators are deferring completions in the near term, hoping that prices will rebound in the coming months.
Chesapeake's Rig Count Lowest Since 2004; Outspend
February 25,2015
Operate 35 – 45 rigs in 2015, the company's lowest operated rig activity level since 2004
Chesapeake Targeting $2.9 Million/Well Goal in the MissLime
November 07,2014
The average peak production rate of the 44 wells that commenced first production in the Mississippian Lime during the 2014 third quarter was approximately...
Chesapeake Cuts Powder River Well Costs; Outlines Completion Design
November 05,2014
Average completed well costs (as measured from January through July) are approximately...
Chesapeake Details Marcellus, Utica Frac Efficiencies; Grows Production
November 05,2014
The company has detailed its average completed well costs, lateral length and frac stages across the two plays.
Chesapeake Averages 146 Days Spud-to-Sales in the Haynesville
November 05,2014
Average completed well costs (as measured from January through July) are approximately $8.2 million with an average completed lateral length of...
Chesapeake Touts 'Outstanding' Eagle Ford Ops; Drills 89 Wells
November 05,2014
Average completed well costs (as measured from January through July) are approximately...
Gulfport and Chesapeake on Target with Changes to Frac Design in Utica
November 03,2014
Gulfport Energy and Chesapeake Energy, two leaders in the Utica Shale play, have both made recent announcements regarding improved results from changes to frac design in the play.Gulfport is switching to slickwater fracs from hybrid, and seeing…
Chesapeake Spending Remains at $5.8B Despite Lower Prices
October 28,2014
Chesapeake maintains its 2014 capex level of spending for 2015.
The Southwest Sweet Spot in the Marcellus
October 21,2014
Shale Experts is taking a look at other operators in the South-West Marcellus and their positions.
Company Hits Three 1,000 Bopd Marble Falls Wells
September 04,2014
3 vertical wells in the Marble Falls formation which IP'd at 992 Bopd.
Chesapeake Augments Eagle Ford Fleet; Details Improvements
August 07,2014
Chesapeake operated an average of 22 rigs (two of which were spudder rigs) and connected 104 gross wells to sales during the 2014 second quarter.